Mendukung pengembangan energi terbarukan di daerah: Pelajaran dari Nusa Tenggara Barat

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document examines the gap between the high renewable energy potential in Nusa Tenggara Barat—specifically minihydro—and its actual installed capacity. It identifies critical bottlenecks including land acquisition, slow asset transfer, lack of coordination between on-grid and off-grid supplies, and inefficient permitting. The study argues for a 'PPPP' (Public-Private-People Partnership) approach, improved provincial capacity, and the strategic use of village funds to overcome these challenges.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Nusa Tenggara Barat has significant untapped renewable energy potential; while minihydro alone could provide over 96.5 MW, the total installed renewable capacity (on and off-grid) was only 14 MW as of 2015.
  • The development of minihydro is hindered by a combination of technical and governance issues, including land acquisition where prices spike when local communities learn of upcoming projects, and unclear land status between conservation areas and community forests.
  • Administrative delays in asset transfer significantly stall projects; for example, a community-managed solar PV installation in Labangka, Sumbawa, remained non-operational because infrastructure and equipment had not been transferred from the Ministry of Energy and Mineral Resources to the Sumbawa Regency Government.
  • There is a lack of coordination between the state electricity company (PLN) and off-grid providers, risking the obsolescence of off-grid infrastructure if PLN expands its grid into remote areas without coordination with cooperatives and small IPPs.
  • Permitting processes are inefficient and fail to distinguish between commercial installations and community-based self-sufficiency projects, which may require different cost structures and simplified 'one-stop-shop' systems via Bappeda.
  • Financial opportunities for renewable energy exist through the Indonesian government's removal of fuel subsidies and the allocation of village funds (approximately 1 billion Rupiah per village), as seen in Desa Sisik, Lombok Tengah, which developed 11 biogas units using village funds.

Cite the original document

APA
Indrawan, M., Muchtar, R., Cameron, L., & Arumdati, N. (2016). Mendukung pengembangan energi terbarukan di daerah: Pelajaran dari Nusa Tenggara Barat. Climate and Development Knowledge Network. https://cdkn.org/sites/default/files/files/Indonesia.pdf
Chicago
Indrawan, Mochamad, Rosmaliati Muchtar, Lachlan Cameron, and Niken Arumdati. Mendukung pengembangan energi terbarukan di daerah: Pelajaran dari Nusa Tenggara Barat. Climate and Development Knowledge Network, 2016. https://cdkn.org/sites/default/files/files/Indonesia.pdf.
Wikipedia
{{cite report |last1=Indrawan |first1=Mochamad |last2=Muchtar |first2=Rosmaliati |last3=Cameron |first3=Lachlan |last4=Arumdati |first4=Niken |title=Mendukung pengembangan energi terbarukan di daerah: Pelajaran dari Nusa Tenggara Barat |publisher=Climate and Development Knowledge Network |date=July 2016 |url=https://cdkn.org/sites/default/files/files/Indonesia.pdf |access-date=17 August 2026 |via=Climate Insights Directory}}
BibTeX
@techreport{indrawan2016mendukung, author = {Indrawan, Mochamad and Muchtar, Rosmaliati and Cameron, Lachlan and Arumdati, Niken}, title = {{Mendukung pengembangan energi terbarukan di daerah: Pelajaran dari Nusa Tenggara Barat}}, institution = {Climate and Development Knowledge Network}, year = {2016}, month = jul, url = {https://cdkn.org/sites/default/files/files/Indonesia.pdf}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }

Full text

Collected · Record updated