AFIEGO recommends that NEMA reject the EACOP ESIA report, asserting that the project's indirect CO2 emissions are at least 2,000 times higher than the operational emissions reported in the assessment.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The EACOP ESIA report underestimates greenhouse gas emissions by focusing only on operational emissions (11–18 ktCO2e/a) and excluding indirect emissions from the end use of crude oil products. AFIEGO calculates that indirect emissions would be at least 34.3 million metric tons of CO2eq per year, which is 2,000 times higher than the operational figures.
  • The social cost of the project's indirect CO2 emissions for the years 2025-2029 is estimated at $9.62 billion, based on a 3% discount rate and converted 2018 dollars.
  • The project faces significant financial risks, including the potential for the Government of Uganda to borrow heavily for construction costs of USD $3.5 billion, while the project may not be profitable due to the global transition from internal combustion engine vehicles to electric vehicles.
  • The ESIA fails to identify specific water sources or discharge options for the substantial quantities of water required for hydrostatic testing, which is estimated at 16,000 m3 per test section.
  • The ESIA does not specify the volume or disposal method for hazardous 'pigging' waste (wax deposits containing benzene), despite the project's claim that most wax will be reinjected into the pipeline.
  • The project may face operational delays and costs due to a lack of necessary infrastructure, such as the Handeni-Singida highway and electricity distribution networks, as well as a shortage of a skilled local workforce.

Cite the original document

APA
Africa Institute for Energy Governance (2019). AFIEGO comments on EACOP ESIA report submitted to NEMA for action. https://www.afiego.org/wp-content/uploads/2024/03/AFIEGOs-memorandum-to-NEMA-on-gaps-in-EACOP-ESIA.pdf
Chicago
Africa Institute for Energy Governance. AFIEGO comments on EACOP ESIA report submitted to NEMA for action. 2019. https://www.afiego.org/wp-content/uploads/2024/03/AFIEGOs-memorandum-to-NEMA-on-gaps-in-EACOP-ESIA.pdf.
Wikipedia
{{cite press release |author=Africa Institute for Energy Governance |title=AFIEGO comments on EACOP ESIA report submitted to NEMA for action |date=29 August 2019 |url=https://www.afiego.org/wp-content/uploads/2024/03/AFIEGOs-memorandum-to-NEMA-on-gaps-in-EACOP-ESIA.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document afiego-000012)}}
BibTeX
@misc{africainstituteforenergygovernance2019afiego, author = {{Africa Institute for Energy Governance}}, title = {{AFIEGO comments on EACOP ESIA report submitted to NEMA for action}}, publisher = {Africa Institute for Energy Governance}, year = {2019}, month = aug, url = {https://www.afiego.org/wp-content/uploads/2024/03/AFIEGOs-memorandum-to-NEMA-on-gaps-in-EACOP-ESIA.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document afiego-000012} }

Full text

Collected · Record updated