Search Climate Insights Directory
7 results
Environmental and Social Management Plan for Sakteng Wildlife Sanctuary for 2026
The ESMP for Sakteng Wildlife Sanctuary (SWS) for 2026 outlines mitigation strategies for three primary activities: improving alpine meadows at Nakchungla, restoring degraded grazing land at Chabling, and improving waterholes across four sites. Categorized as a Category B project, the plan focuses on managing site-specific, reversible risks such as occupational health and safety, waste generation, and minor soil disturbance. It mandates the use of manual labor, personal protective equipment (PPE), and community engagement through local contractors and grievance redressal mechanisms to support the livelihoods of semi-nomadic herders while conserving biodiversity.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
Environmental and Social Management Plan for Sakteng Wildlife Sanctuary
The ESMP for Sakteng Wildlife Sanctuary outlines mitigation strategies for five key activities: restoring alpine meadows, improving lowland grasslands, implementing bioengineering for watershed management, restoring natural saltlicks, and maintaining the Joenkhar Range Office. It integrates Bhutanese national laws with WWF's Social Safeguards Integrated Policies and Procedures (SIPP), prioritizing the latter in cases of discrepancy, particularly regarding compensation for non-title land users and community consultation. The plan details specific environmental risks, such as the spread of invasive alien species and waste generation, and mandates strict occupational health and safety (OHS) standards for workers, including the provision of safety gear and standardized living facilities.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
Environmental and Social Management Plan for Sakteng Wildlife Sanctuary, 2022
The 2022 ESMP for Sakteng Wildlife Sanctuary outlines mitigation strategies for three primary activities: the construction of a garage cum store, maintenance of the Sakteng Range office and water supply, and maintenance of the SWS Head Office and staff quarters. It provides a detailed baseline of the sanctuary's alpine and temperate ecosystems, socio-economic conditions of the Merak and Sakteng Gewogs, and rigorous occupational health and safety (OHS) standards for contracted workers.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
Bhutan for Life Environmental and Social Management Plan for Sakteng Wildlife Sanctuary
The 2021 ESMP for the Sakteng Wildlife Sanctuary (SWS) outlines mitigation strategies for four primary activities: restoring 20 hectares of alpine meadows, restoring 30 hectares of grassland, constructing 320m of river bank protection on the Keyjurong stream, and building a breast wall for staff quarters. The plan prioritizes worker health and safety, waste management, and soil erosion prevention, with a total budget of Nu. 3,528,813.00. Implementation is overseen by a BFL focal person and monitored through field reports and photographic evidence, ensuring compliance with both Royal Government of Bhutan laws and WWF's more extensive Social Safeguards Integrated Policies and Procedures.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
Bhutan for Life Environmental and Social Management Plan for Jomotsangkha Wildlife Sanctuary
The 2020 ESMP for Jomotsangkha Wildlife Sanctuary (JWS) outlines mitigation strategies for five key activities: the construction of a head office, improvement of waterholes and salt licks, restoration of lowland grasslands, river protection work, and maintenance of staff quarters. It integrates Bhutanese national law with WWF's Social Safeguards Integrated Policies and Procedures (SIPP), prioritizing the more stringent WWF standards where discrepancies exist, particularly regarding compensation for non-title land users and community consultation. The plan details specific environmental risks, such as vegetation clearing and aquatic habitat disturbance, and social risks, including water-source conflicts between construction workers and local communities. Implementation is managed by BFL focal persons and contractors, with a monitoring framework involving weekly field visits and quarterly reports to ensure compliance.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
Bhutan for Life Environmental and Social Management Plan for Biological Corridor 6
The ESMP for Biological Corridor 6 (BC 6) outlines the environmental and social safeguards required for habitat restoration activities planned for 2020. BC 6, covering 270.80 km² and primarily consisting of forest, connects the Sakteng and Jomotshangka Wildlife Sanctuaries. Planned activities include the restoration of 1 hectare of lowland grassland and 2 hectares of salt licks and waterholes. The plan identifies potential risks such as forest fires, poaching, and conflicts with local communities over the removal of fences around waterholes. Mitigation measures include controlled burning, community consultations, and religious offerings to appease local deities. Implementation is managed by BFL focal persons and monitored through field visits and reports to the Project Coordination Unit (PCU) and WWF.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
Environmental and Social Management Plan for Sakteng Wildlife Sanctuary
The ESMP for the Sakteng Wildlife Sanctuary (SWS) outlines mitigation strategies for four primary activities planned for 2020: the construction of a Takin Translocation Facility, staff quarters, river bank protection walls, and waterhole improvements. It integrates Bhutanese national law with WWF's Social Safeguards Integrated Policies and Procedures (SIPP), specifying that WWF standards prevail in cases of discrepancy, particularly regarding compensation for non-title land holders and community consultation. The plan details specific environmental risks—such as noise, air pollution, and waste—and social risks, including impacts on transhumant grazing and potential increases in poaching. Implementation is managed by BFL focal persons and contractors, with a monitoring framework involving weekly field visits and quarterly reports to ensure compliance.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report