Search Climate Insights Directory
1 result
DateDocumentOrganization and type
8.2-run-until-2025-5-464c7f87ca73e9f7.pdf
This report provides a consolidated life-extension (Life-ex) assessment of the Hendrina Power Station, focusing on the boiler, draft plant, and turbine plant. It details component failures, modifications, and inspection results to determine the feasibility of running the plant until 2025 or 2035, highlighting critical life exhaustion in high-pressure turbine components and erosion in air heaters and PA fans.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
Showing 1–1 of 1 document