Search Climate Insights Directory

Search syntax
intitle:
The document title intitle:"climate education"
ispublisher:
The publishing organization ispublisher:CAPE
insummary:
Summary and key findings insummary:"conflict of interest"
hasconcept:
Climate tags, frame/perspective and analysis type hasconcept:"Climate Justice"
geography:
Regions the document covers or discusses geography:Canada
doctype:
Document type doctype:report
lang:
Document language, as an ISO code lang:fr
cidid:
One record, by its directory id cidid:iisd-000297
Analysis TypeProbabilistic modeling
Clear all

2 results

  • Climate Central analysis indicates that human-caused climate change has significantly increased the risk of sub-optimal temperatures (21°C or higher) that impair elite soccer performance during the 2025 UEFA Champions League knockout stages. Comparing current data to the 1970s, the likelihood of such heat has risen for all 23 analyzed stadiums, with the most dramatic increase occurring at Lluís Companys Olympic Stadium in Barcelona, where the risk increased by 800%. This temperature threshold is critical because research shows that players cover less total distance, sprint less, and perform fewer high-intensity efforts when temperatures reach or exceed 21°C.

    AI-generated

    This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

    Document type: Report

    Regions: Europe
  • The paper addresses the financial risk in India's renewable energy sector caused by the poor financial health of state-owned electricity distribution companies (DISCOMs), which can add up to 1.07% to the cost of debt. It defines a Payment Security Mechanism (PSM) as a funded capital reserve providing interest-free working capital during default events. The authors propose a five-step stochastic methodology to determine the optimal PSM size required to achieve specific credit rating enhancements for projects. Applying this to eight sample DISCOMs, the study finds that most require approximately 12 months of payment support to reach a BB rating, typically representing 10%-20% of a project's total capital expenditure. The paper concludes that the maximum credit enhancement achievable through a PSM is a BB rating, as other non-counterparty risks limit further improvement to BBB or higher.

    AI-generated

    This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

    Document type: Research paper

    Regions: India
Showing 1–2 of 2 documents