Search Climate Insights Directory
1 result
DateDocumentOrganization and type
Assessment of the Need for the proposed Karpowership Power Plant projects
The report argues that the proposed 1.2 GW Karpowership gas power plants are not aligned with a least-cost investment pathway for South Africa. Drawing on a study by Meridian Economics and the CSIR, it finds that the grid should prioritize rapid renewable energy build-out and storage, with new gas capacity not being economically optimal until the mid-2030s. The document concludes that commissioning these plants by 2022 would create an unnecessary economic burden for ratepayers and that the procurement process (RMIPP) was biased against renewable energy options.
AI-generated
This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.
Document type: Report
Showing 1–1 of 1 document