Assessment of the Need for the proposed Karpowership Power Plant projects
Summary
This document is a report assessing the necessity of proposed Karpowership power plant projects in South Africa. It concludes that the projects are not required to meet the country's electricity needs and are likely more expensive than alternative options.
Key insights
- The assessment suggests that the South Africa Risk Mitigation Independent Power Producer procurement Programme is a more appropriate mechanism for adding capacity to the power system.
Cite the original document
- APA
- Centre for Environmental Rights (n.d.). Assessment of the Need for the proposed Karpowership Power Plant projects. https://cer.org.za/wp-content/uploads/2021/08/Annexure-AJ2-RMI-Report-27.07.2021.pdf?x21779
- Chicago
- Centre for Environmental Rights. Assessment of the Need for the proposed Karpowership Power Plant projects. n.d. https://cer.org.za/wp-content/uploads/2021/08/Annexure-AJ2-RMI-Report-27.07.2021.pdf?x21779.
- Wikipedia
- {{cite report |author=Centre for Environmental Rights |title=Assessment of the Need for the proposed Karpowership Power Plant projects |url=https://cer.org.za/wp-content/uploads/2021/08/Annexure-AJ2-RMI-Report-27.07.2021.pdf?x21779 |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{centreforenvironmentalrightsndassessment, author = {{Centre for Environmental Rights}}, title = {{Assessment of the Need for the proposed Karpowership Power Plant projects}}, institution = {Centre for Environmental Rights}, url = {https://cer.org.za/wp-content/uploads/2021/08/Annexure-AJ2-RMI-Report-27.07.2021.pdf?x21779}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated