Bhutan for Life Environmental and Social Management Plan for Biological Corridor 4
Summary
The document outlines the environmental and social safeguards for Biological Corridor 4 (BC 4) in Bhutan, focusing on two primary activities planned for 2024-2025: the enhancement of lowland grassland at Pirchen and the construction of a Range Office at Shingkhar. It establishes a framework for managing occupational health and safety, waste, and community grievances, ensuring compliance with both Royal Government of Bhutan (RGoB) laws and WWF's Social Safeguards Integrated Policies and Procedures (SIPP).
Key insights
- Biological Corridor 4 (BC 4) is the largest biological corridor in Bhutan, covering 594 sq.km with an elevation range of 228-4570 masl, and supports 94 species of vascular plants, 25 species of mammals, and 150 species of birds.
- The project identifies two specific activities for July 2024 – June 2025: the enhancement of 4 hectares of lowland grassland at Pirchen (budgeted at Nu. 150,000.00) and the construction of a Range Office at Shingkhar on 60 decimal of institutional land (budgeted at Nu. 5,500,000.00).
- Where discrepancies exist between the Royal Government of Bhutan (RGoB) laws and WWF’s Social Safeguards Integrated Policies and Procedures (SIPP), the WWF SIPP prevails, particularly regarding the eligibility of non-title holders for compensation and the requirement for extensive community consultations.
- Potential impacts for the Pirchen grassland activity include occupational health and safety hazards, accidental forest fires during debris burning, and the regrowth of non-palatable species; mitigation includes providing PPE and using controlled burning techniques.
- The construction of the Shingkhar Range Office is expected to generate solid waste, dust, and noise pollution, and present occupational health and safety risks; mitigation measures include restricting operations to 7am – 7pm and installing waste bins.
- A multi-tiered Grievance Redressal Mechanism (GRM) is established, allowing stakeholders to report issues via the BFL-specific mechanism (through gewog or forest offices), the WWF Grievance Mechanism (via a Project Complaints Officer), or the GCF Independent Review Mechanism.
Cite the original document
- APA
- WWF International (2024). Bhutan for Life Environmental and Social Management Plan for Biological Corridor 4. https://files.worldwildlife.org/wwfcmsprod/files/Publication/file/4i4e2rafea_BC4_ESMP_2024.pdf
- Chicago
- WWF International. Bhutan for Life Environmental and Social Management Plan for Biological Corridor 4. 2024. https://files.worldwildlife.org/wwfcmsprod/files/Publication/file/4i4e2rafea_BC4_ESMP_2024.pdf.
- Wikipedia
- {{cite report |author=WWF International |title=Bhutan for Life Environmental and Social Management Plan for Biological Corridor 4 |date=2024 |url=https://files.worldwildlife.org/wwfcmsprod/files/Publication/file/4i4e2rafea_BC4_ESMP_2024.pdf |access-date=23 October 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{wwfinternational2024bhutan, author = {{WWF International}}, title = {{Bhutan for Life Environmental and Social Management Plan for Biological Corridor 4}}, institution = {WWF International}, year = {2024}, url = {https://files.worldwildlife.org/wwfcmsprod/files/Publication/file/4i4e2rafea_BC4_ESMP_2024.pdf}, urldate = {2026-10-23}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated