modernizing public Transportation
Summary
The report examines the transition from traditional, inefficient bus services to modernized systems, primarily Bus Rapid Transit (BRT), across 13 cities in Latin America and Asia. It highlights that while these systems generally improve travel speed, reduce emissions, and lower capital costs compared to rail, they often suffer from rushed implementation, inadequate user education, and financial instability due to politically determined fares. The analysis emphasizes the importance of high-level political commitment, comprehensive planning, and the use of technical fare-setting to ensure long-term sustainability.
Key insights
- Modernized bus systems, particularly BRT, offer high capacity and relatively low capital costs compared to rail, with implementation times typically ranging from two to five years.
- The 13 reviewed systems achieved a wide range of peak usage, with Bogotá's TransMilenio reaching 43,000 passengers per hour per direction, while others ranged from 1,780 to 13,000.
- Capital costs for these improvements varied significantly based on the level of infrastructure work, ranging from US$1.4 million per kilometer in Jakarta to US$12.5 million per kilometer in Bogotá.
- Many projects suffered from rushed implementation to meet the term limits of elected officials, leading to operational failures, incomplete infrastructure, and insufficient driver training.
- Financial sustainability is frequently compromised when fares are set by political authorities to maximize public support rather than based on the actual technical cost of service.
- Advanced fare collection systems were consistently difficult to implement due to short schedules that prevented adequate software adaptation and testing for local conditions.
- Top-down decision-making processes, led by high-level political figures, generally resulted in faster project implementation and fewer initial interagency conflicts than bottom-up approaches.
- The report identifies a recurring problem with rapid pavement deterioration in several cities, often caused by inadequate structural design or the use of existing roadways without necessary improvements.
- A lack of comprehensive user education and public information prior to launch led to chaotic conditions and public protests in cities like México City, León, and Santiago.
Cite the original document
- APA
- HIDALGO, D., & CARRIGAN, A. (2010). modernizing public Transportation. World Resources Institute. https://pdf.wri.org/modernizing_public_transportation.pdf
- Chicago
- HIDALGO, DARIO, and AILEEN CARRIGAN. modernizing public Transportation. World Resources Institute, 2010. https://pdf.wri.org/modernizing_public_transportation.pdf.
- Wikipedia
- {{cite report |last1=HIDALGO |first1=DARIO |last2=CARRIGAN |first2=AILEEN |title=modernizing public Transportation |publisher=World Resources Institute |date=2010 |url=https://pdf.wri.org/modernizing_public_transportation.pdf |access-date=17 August 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{hidalgo2010modernizing, author = {HIDALGO, DARIO and CARRIGAN, AILEEN}, title = {{modernizing public Transportation}}, institution = {World Resources Institute}, year = {2010}, url = {https://pdf.wri.org/modernizing_public_transportation.pdf}, urldate = {2026-08-17}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated