Repositioning electricity planning at the core: An evaluation of South Africa’s Integrated Resource Plan
Summary
The report finds that while South Africa's IRP process has improved in transparency and stakeholder engagement since 2009, it remains a theoretical exercise due to a lack of enforceable execution plans and the marginalisation of social and environmental objectives.
Key insights
- The South African IRP process has seen significant improvement since 2009, particularly in its ability to mobilise data from stakeholders and its transparency regarding assumptions and methodologies.
- Environmental and social impact assessments are almost entirely absent from the IRP process, with water usage and greenhouse gas emissions being the only factors partially addressed.
- The carbon emission constraint of 275 million tons per year from 2025 set in the IRP 2010 is insufficient to meet South Africa's international greenhouse gas emission commitments.
- Electricity planning in South Africa has historically suffered from a pattern of 'lumpy' investment decisions, leading to periods of excess capacity followed by severe shortages and price spikes.
- The IRP is often prioritised over the broader Integrated Energy Plan (IEP), resulting in a project-based approach to planning rather than a long-term sustainable vision.
- The 2013 IRP update proposed reducing planned nuclear capacity from 11.4 GW to 6.6 GW by 2030, suggesting that new nuclear baseload might not be required until 2025 or 2035.
- The IRP lacks a clear budget plan and does not substantively assess the potential for phasing out fossil fuel subsidies.
- Implementation of the IRP is hindered by a 'failed balance of powers' and confusion over the responsibilities of the DoE, NERSA, and Eskom, often leading to politicised decision-making.
- The IRP 2010 planned for 17.8 GW of renewable energy-based generation, representing 42% of all new build generation to 2030.
- The IRP fails to incorporate gender considerations and the specific needs of rural communities, leading to the rejection of the plan by gender-based institutions.
Cite the original document
- APA
- Montmasson-Clair, G., & Ryan, G. (2014). Repositioning electricity planning at the core: An evaluation of South Africa’s Integrated Resource Plan. Trade and Industrial Policy Strategies. http://www.tips.org.za/files/u72/tips_nedlac_review_of_irp_november_2014.pdf
- Chicago
- Montmasson-Clair, Gaylor, and Georgina Ryan. Repositioning electricity planning at the core: An evaluation of South Africa’s Integrated Resource Plan. Trade and Industrial Policy Strategies, 2014. http://www.tips.org.za/files/u72/tips_nedlac_review_of_irp_november_2014.pdf.
- Wikipedia
- {{cite report |last1=Montmasson-Clair |first1=Gaylor |last2=Ryan |first2=Georgina |title=Repositioning electricity planning at the core: An evaluation of South Africa’s Integrated Resource Plan |publisher=Trade and Industrial Policy Strategies |date=25 November 2014 |url=http://www.tips.org.za/files/u72/tips_nedlac_review_of_irp_november_2014.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document tipsza-000637)}}
- BibTeX
- @techreport{montmassonclair2014repositioning, author = {Montmasson-Clair, Gaylor and Ryan, Georgina}, title = {{Repositioning electricity planning at the core: An evaluation of South Africa’s Integrated Resource Plan}}, institution = {Trade and Industrial Policy Strategies}, year = {2014}, month = nov, url = {http://www.tips.org.za/files/u72/tips_nedlac_review_of_irp_november_2014.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document tipsza-000637} }
Full text
Collected · Record updated