Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The paper outlines a strategic project to build a co-processing facility at a cement plant in South Africa, with an estimated budget of R30 million to R35 million. By processing non-hazardous industrial waste into a homogenous alternative fuel, the project seeks to reduce the cement industry's carbon footprint and decrease landfill reliance. It argues that such an intervention will help the Department of Trade, Industry and Competition (dtic) understand waste value chains, potentially increasing the waste economy's GDP contribution from 0.62% to 1.5% within 10 years and creating up to 127,000 jobs.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The South African cement industry is a significant source of greenhouse gases, with local industry alone contributing over 1% of the country's total GHGs. In 2016, six companies produced approximately 18 million tons of cement, with each ton generating 0.87 tons of CO2.
  • Substituting fossil fuels with alternative fuels in cement kilns can significantly reduce emissions; international literature indicates this can decrease carbon emissions by 40% of the total reduction required for a two-degree climate change scenario.
  • South Africa's waste economy is currently hindered by low landfill costs (R100 to R200 per ton compared to R1,500 to R2,000 in Europe) and a lack of documented waste value chains. However, the waste economy's GDP contribution could rise from 0.62% to 1.5% in 10 years if supported, potentially creating 127,000 jobs.
  • The proposed co-processing facility would process non-hazardous general industrial waste—such as paper, plastic, and tyres—into a homogenous fuel and raw material substitute for clinker production. This process requires specific sorting, shredding, grinding, and blending to meet strict calorific and chemical specifications.
  • Establishing a small co-processing facility on a cement plant's premises is estimated to cost between R30 million and R38 million, which aligns with international estimates for small plants (approximately €2 million).
  • The project is expected to create direct employment, including 8 to 10 employees at the processing plant and 30 to 40 at the waste collection facility, primarily in rural areas where cement plants are typically located.

Cite the original document

APA
Lowitt, S. (2020). ALTERNATIVE FUEL. Trade and Industrial Policy Strategies. https://tips.org.za/images/Alternative_fuel_-_post_covid_industrial_development_projects.pdf
Chicago
Lowitt, Sandy. ALTERNATIVE FUEL. Trade and Industrial Policy Strategies, 2020. https://tips.org.za/images/Alternative_fuel_-_post_covid_industrial_development_projects.pdf.
Wikipedia
{{cite report |last1=Lowitt |first1=Sandy |title=ALTERNATIVE FUEL |publisher=Trade and Industrial Policy Strategies |date=December 2020 |url=https://tips.org.za/images/Alternative_fuel_-_post_covid_industrial_development_projects.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document tipsza-000233)}}
BibTeX
@techreport{lowitt2020alternative, author = {Lowitt, Sandy}, title = {{ALTERNATIVE FUEL}}, institution = {Trade and Industrial Policy Strategies}, year = {2020}, month = dec, url = {https://tips.org.za/images/Alternative_fuel_-_post_covid_industrial_development_projects.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document tipsza-000233} }

Full text

Collected · Record updated