NIPPING ECONOMIC STAGNATION IN THE BUD – THE ROLE OF TRANSMISSION INFRASTRUCTURE IN SOUTH AFRICA’S GREEN ECONOMY INDUSTRIALISATION

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The document argues that South Africa's transmission grid is a major barrier to renewable energy deployment, but the required build-out of over 2,000km of lines per annum presents a significant opportunity to scale up domestic EPC and manufacturing firms through targeted industrial policy.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • South Africa's transmission grid is currently a primary obstacle to new power generation, with only 17GW of spare capacity; this was evidenced in December 2022 when only five preferred bidders were selected for the REIPPPP bid window 6 (BW6) due to grid constraints.
  • To achieve energy security, South Africa needs to add 4,000–5,000MW of power generation annually, requiring approximately 14,218km of transmission lines and 106GVA of transformer capacity over the next decade.
  • There is a significant gap between the required grid build-rate and current domestic capacity: the national grid requires over 2,000km per annum, while domestic contracting firms can currently only build 300km per annum.
  • Decarbonized grids require more extensive infrastructure than fossil-fuel-based grids because renewable power stations generally have lower output per station, necessitating a more decentralized and spread-out grid.
  • Local EPC firms face four primary barriers to scaling up for grid expansion: a shortage of accredited engineers, insufficient guarantee facilities for large projects, a lack of long-term market certainty (at least two years), and a lack of technical skills in the schooling system.
  • Eskom is shifting toward an Engineer, Procure, and Construct (EPC) contracting model to expedite grid expansion, moving away from traditional bureaucratic procedures.

Cite the original document

APA
Rathupetsane, A. (2023). NIPPING ECONOMIC STAGNATION IN THE BUD – THE ROLE OF TRANSMISSION INFRASTRUCTURE IN SOUTH AFRICA’S GREEN ECONOMY INDUSTRIALISATION. Trade and Industrial Policy Strategies. https://forum.tips.org.za/images/forum%20papers/2023/Alboricah_Rathupetsane_TIPS_forum_2023_Paper.pdf
Chicago
Rathupetsane, Alboricah. NIPPING ECONOMIC STAGNATION IN THE BUD – THE ROLE OF TRANSMISSION INFRASTRUCTURE IN SOUTH AFRICA’S GREEN ECONOMY INDUSTRIALISATION. Trade and Industrial Policy Strategies, 2023. https://forum.tips.org.za/images/forum%20papers/2023/Alboricah_Rathupetsane_TIPS_forum_2023_Paper.pdf.
Wikipedia
{{cite report |last1=Rathupetsane |first1=Alboricah |title=NIPPING ECONOMIC STAGNATION IN THE BUD – THE ROLE OF TRANSMISSION INFRASTRUCTURE IN SOUTH AFRICA’S GREEN ECONOMY INDUSTRIALISATION |publisher=Trade and Industrial Policy Strategies |date=August 2023 |url=https://forum.tips.org.za/images/forum%20papers/2023/Alboricah_Rathupetsane_TIPS_forum_2023_Paper.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document tipsza-000232)}}
BibTeX
@techreport{rathupetsane2023nipping, author = {Rathupetsane, Alboricah}, title = {{NIPPING ECONOMIC STAGNATION IN THE BUD – THE ROLE OF TRANSMISSION INFRASTRUCTURE IN SOUTH AFRICA’S GREEN ECONOMY INDUSTRIALISATION}}, institution = {Trade and Industrial Policy Strategies}, year = {2023}, month = aug, url = {https://forum.tips.org.za/images/forum%20papers/2023/Alboricah_Rathupetsane_TIPS_forum_2023_Paper.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document tipsza-000232} }

Full text

Collected · Record updated