The VPP Flipbook outlines how utilities can aggregate distributed energy resources (DERs)—such as batteries, electric vehicles, and smart thermostats—to provide grid services like capacity, energy, and resilience. It details a six-step development process and provides specific examples from utilities including PG&E, National Grid, and Green Mountain Power. The document emphasizes the importance of open-access structures, third-party partnerships, and the integration of VPPs into long-term resource planning to address load growth and decarbonization goals.
Key insights
- VPPs are grid-integrated aggregations of distributed energy resources (DERs) that can provide utility-scale services, including capacity, energy, ancillary services, and resilience, helping to alleviate stressed transmission and distribution systems and integrate more renewable energy.
- The US Department of Energy estimates that tripling VPP scale by 2030 could address 10%–20% of peak load and save approximately $10 billion annually in grid costs, with the potential to scale to 80–160 GW by 2030.
- Effective VPP program design requires an open-access structure to integrate multiple technologies and vendors, the use of long-term programs (5+ years) to improve cost-effectiveness, and the streamlining of customer enrollment to maximize participation.
- Utilities are encouraged to reimagine business practices by implementing cross-functional teams (spanning customer programs, operations, distribution, and planning) and automating administrative processes to enable scaling.
- Case studies demonstrate diverse VPP models: Arizona Public Service's Cool Rewards enrolled 83,000+ thermostats for 145 MW of capacity by 2023; Green Mountain Power's battery programs provide over 30 MW in capacity reductions; and California's ELRP and DSGS programs leveraged DERs for nine consecutive days in September 2022 to avoid rolling blackouts.
- EV-focused VPPs, such as those by DTE Energy and Duke Energy, utilize the Open Vehicle Integration Platform (OVGIP) to allow utilities to access multiple OEM brands through a single interface for managed charging and demand response.
- VPP implementation involves a six-step iterative process: defining objectives, baselining resources, initial draft design, stakeholder engagement, updated design/procurement/operation, and finally program assessment and expansion.
Cite the original document
- APA
- Brehm, K., & Tobin, M. (n.d.). VIRTUAL POWER PLANT FLIPBOOK. RMI. https://rmi.org/wp-content/uploads/dlm_uploads/2024/07/VP3_flipbook_v1_3.pdf
- Chicago
- Brehm, Kevin, and Mary Tobin. VIRTUAL POWER PLANT FLIPBOOK. RMI, n.d. https://rmi.org/wp-content/uploads/dlm_uploads/2024/07/VP3_flipbook_v1_3.pdf.
- Wikipedia
- {{cite report |last1=Brehm |first1=Kevin |last2=Tobin |first2=Mary |title=VIRTUAL POWER PLANT FLIPBOOK |publisher=RMI |url=https://rmi.org/wp-content/uploads/dlm_uploads/2024/07/VP3_flipbook_v1_3.pdf |access-date=23 October 2026 |via=Climate Insights Directory}}
- BibTeX
- @techreport{brehmndvirtual, author = {Brehm, Kevin and Tobin, Mary}, title = {{VIRTUAL POWER PLANT FLIPBOOK}}, institution = {RMI}, url = {https://rmi.org/wp-content/uploads/dlm_uploads/2024/07/VP3_flipbook_v1_3.pdf}, urldate = {2026-10-23}, note = {Indexed by Climate Insights Directory} }
Full text
Collected · Record updated