SHELL’S AND BP’S STALLED TAR SANDS AMBITIONS
Summary
The report finds that the stalling of Canadian tar sands projects is driven by a combination of low oil prices and a critical lack of pipeline infrastructure, rendering many projects economically unviable.
Key insights
- Since 2014, 42 tar sands projects have been put on-hold, delayed, or cancelled, including Shell's Carmon Creek and BP's Sunrise project phases 2A and 2B.
- The mainstream narrative that low oil prices are the sole cause of project delays is inaccurate; more than half of the analyzed projects would have remained viable under post-crash price expectations if pipeline access had been available.
- Of the 27 projects assessed, 14 were rendered uneconomic by the combination of 2015 oil prices and the additional cost of rail transport, representing over 60% of the reserves in those projects.
- Without new pipelines, the export system for tar sands crude could reach its limit as soon as 2018, leaving no room for growth beyond projects already under construction.
- Future BP and Shell projects generally have breakeven prices between $75 and $85 per barrel if the Kinder Morgan pipeline is built, but this increases to $95-$110 if they must rely on rail.
- The Alberta government's 100 megatonne per year emissions cap for 2020-30 will limit further expansion unless the industry achieves significant efficiency gains in emissions intensity, which have remained flat since 2005.
- The International Oil Company (IOC) business model is under threat because it relies on high-cost, frontier-driven growth that must compete with cheaper oil from national oil companies and the responsive nature of US shale production.
Cite the original document
- APA
- Oil Change International (n.d.). SHELL’S AND BP’S STALLED TAR SANDS AMBITIONS. https://oilchange.org/wp-content/uploads/2017/04/FlawedFundamentalsTarSands.pdf
- Chicago
- Oil Change International. SHELL’S AND BP’S STALLED TAR SANDS AMBITIONS. n.d. https://oilchange.org/wp-content/uploads/2017/04/FlawedFundamentalsTarSands.pdf.
- Wikipedia
- {{cite report |author=Oil Change International |title=SHELL’S AND BP’S STALLED TAR SANDS AMBITIONS |url=https://oilchange.org/wp-content/uploads/2017/04/FlawedFundamentalsTarSands.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document oilcha-000429)}}
- BibTeX
- @techreport{oilchangeinternationalndshells, author = {{Oil Change International}}, title = {{SHELL’S AND BP’S STALLED TAR SANDS AMBITIONS}}, institution = {Oil Change International}, url = {https://oilchange.org/wp-content/uploads/2017/04/FlawedFundamentalsTarSands.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document oilcha-000429} }
Full text
Collected · Record updated