India's thermal generation sector carries US$40-60 billion in non-performing or stranded assets, which is undermining the banking sector and the transition to renewable energy.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • India's thermal generation sector is burdened by US$40-60 billion in non-performing or stranded assets, while the combined total shared between distribution companies (discoms) and the thermal coal- and gas-fired power plant sectors exceeds US$100 billion.
  • Low-cost renewable energy tariffs, consistently below Rs3/kWh with zero indexation, pose a fundamental threat to the viability of new and proposed thermal coal-fired power plants.
  • The thermal power sector's financial distress is driven by multiple factors, including loss of competitiveness to renewables, poor investment decisions, construction cost and timeline overruns, fuel supply issues, and land acquisition conflicts.
  • Water stress is a significant risk, as approximately 40% of India's current thermal capacity is located in water-stressed areas, leading to generation and revenue losses.
  • High costs associated with transporting domestic coal over long distances—sometimes exceeding 500km or 1,000km—significantly increase the cost of power generation and reduce plant viability.
  • The Reserve Bank of India's (RBI) attempts to tighten lending to stressed assets via the '12th February Circular' were quashed by the Supreme Court of India in April 2019, which invalidated actions taken under the circular.
  • India's gas-fired power sector is largely stranded; the Chair of the State Bank of India stated in early 2019 that all 25GW of operational gas-fired power plants in India were stranded assets.
  • IEEFA projects that net new additions in the coal-fired sector by FY2029/30 will be only 30GW, significantly lower than government projections of 90GW to 110GW.
  • Case studies of 12 thermal power plants reveal common themes of stranding, such as the Tata Mundra plant's unviability due to high imported coal prices and the Koradi expansion's risk from air pollution concerns.

Cite the original document

APA
Buckley, T., Garg, V., Nicholas, S., & Shah, K. (2019). Seriously Stressed and Stranded. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/The-Burden-of-NonPerforming-Assets-in-India-Thermal-Power-Sector_December-2019.pdf
Chicago
Buckley, Tim, Vibhuti Garg, Simon Nicholas, and Kashish Shah. Seriously Stressed and Stranded. Institute for Energy Economics and Financial Analysis, 2019. https://ieefa.org/sites/default/files/resources/The-Burden-of-NonPerforming-Assets-in-India-Thermal-Power-Sector_December-2019.pdf.
Wikipedia
{{cite report |last1=Buckley |first1=Tim |last2=Garg |first2=Vibhuti |last3=Nicholas |first3=Simon |last4=Shah |first4=Kashish |title=Seriously Stressed and Stranded |publisher=Institute for Energy Economics and Financial Analysis |date=December 2019 |url=https://ieefa.org/sites/default/files/resources/The-Burden-of-NonPerforming-Assets-in-India-Thermal-Power-Sector_December-2019.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001988)}}
BibTeX
@techreport{buckley2019seriously, author = {Buckley, Tim and Garg, Vibhuti and Nicholas, Simon and Shah, Kashish}, title = {{Seriously Stressed and Stranded}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2019}, month = dec, url = {https://ieefa.org/sites/default/files/resources/The-Burden-of-NonPerforming-Assets-in-India-Thermal-Power-Sector_December-2019.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001988} }

Full text

Collected · Record updated