The hidden costs of coalmines’ unquenchable thirst
Summary
The report finds that Australian coalminers lost approximately AU$5 billion in potential sales across 2022 due to flooding and severe weather, highlighting the significant financial vulnerability of the sector to water-related risks.
Key insights
- Australian coalminers lost more than 20 million tonnes in run-of-mine (ROM) coal production, representing approximately AU$5 billion in potential coal sales, across the 2022 calendar and financial years, primarily due to flooding and severe weather.
- Coalmining is the most water-intensive mining process in Australia, consuming approximately 667 litres of water per tonne of coal produced, though total water take remains unknown due to a lack of transparency and reporting.
- Water entitlement values in New South Wales increased by 17% in just two years, rising from more than AU$29 billion in 2021 to an estimated AU$34 billion in 2023.
- The coal industry is responsible for approximately 90% of regulated water discharges to the environment from mining activity in Australia, and has faced over 60 cases of illegal contaminated water discharges between 2013 and 2023, resulting in penalties exceeding AU$7.6 million.
- Illegal water take by coalmines between 2016 and 2023 has exceeded 12 gigalitres, costing operators at least AU$9 million in fines, legal fees, compensation, and enforceable undertakings.
- Increasing government scrutiny and community opposition based on water-management concerns are causing delays or cancellations of mining approvals, affecting project development timelines.
- Rehabilitation of large open-cut coalmines in Australia is a significant risk, as no large open-cut coalmine in the country has yet completed rehabilitation and been fully relinquished.
- Water modelling used for mining approvals often fails to incorporate extreme climatic variations or accurately predict impacts on local water sources, leading to significant discrepancies between company and government estimates.
Cite the original document
- APA
- Knight, A.-L. (n.d.). The hidden costs of coalmines’ unquenchable thirst. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2024-03/The%20hidden%20costs%20of%20coalmines%20unquenchable%20thirst_Mar24.pdf
- Chicago
- Knight, Anne-Louise. The hidden costs of coalmines’ unquenchable thirst. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2024-03/The%20hidden%20costs%20of%20coalmines%20unquenchable%20thirst_Mar24.pdf.
- Wikipedia
- {{cite report |last1=Knight |first1=Anne-Louise |title=The hidden costs of coalmines’ unquenchable thirst |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2024-03/The%20hidden%20costs%20of%20coalmines%20unquenchable%20thirst_Mar24.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001982)}}
- BibTeX
- @techreport{knightndhidden, author = {Knight, Anne-Louise}, title = {{The hidden costs of coalmines’ unquenchable thirst}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2024-03/The%20hidden%20costs%20of%20coalmines%20unquenchable%20thirst_Mar24.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001982} }
Full text
Collected · Record updated