Thar Coal Locking Pakistan Into Unsustainable Capacity Payments

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This report finds that Pakistan is locking itself into unsustainable financial obligations through coal-fired power capacity payments, which could reach Rs1.5 trillion (US$9bn) in the coming years. It argues that transitioning to wind and solar power, particularly in Sindh province, would reduce costs and mitigate the risk of stranded assets.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Total capacity payments to public, private, and CPEC power generators in Pakistan could reach an unsustainable Rs1.5 trillion (US$9bn) in the next few years as more capacity is added.
  • The risk of overcapacity in Pakistan is increasing due to the COVID-19 pandemic and previously slow economic growth; for example, electricity consumption in Sindh province (excluding K-Electric) actually declined in FY2018-19.
  • Renewable energy is the cheapest source of new power generation in Pakistan and avoids the high capacity payments associated with coal-fired plants, which typically cover principal and interest payments over the first ten years of operation.
  • Pakistan's reliance on coal power is increasing its debt dependency on China, as international finance for coal is drying up and Chinese finance is becoming the only available funding source for such projects.
  • An IEEFA model for Sindh province suggests that by 2030, renewable energy could reach over 50% of the province's capacity through the addition of 6GW of wind and 3GW of utility-scale solar, making further coal developments unnecessary to meet demand growth.
  • The 'Super Six' wind projects in Sindh's Gharo-Jhimpir wind corridor, totaling 310MW of capacity, are expected to provide the lowest cost electricity seen in Pakistan.
  • Other countries in the Belt and Road Initiative have faced similar overcapacity issues; Bangladesh's power capacity utilisation was only 43% in 2018-19, with capacity payments to idle plants reaching Tk90bn (US$1.1bn).

Cite the original document

APA
Nicholas, S. (2020). Thar Coal Locking Pakistan Into Unsustainable Capacity Payments. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2022-05/Thar-Coal-Locking-Pakistan-Into-Unsustainable-Capacity-Payments_June-2020.pdf
Chicago
Nicholas, Simon. Thar Coal Locking Pakistan Into Unsustainable Capacity Payments. Institute for Energy Economics and Financial Analysis, 2020. https://ieefa.org/sites/default/files/2022-05/Thar-Coal-Locking-Pakistan-Into-Unsustainable-Capacity-Payments_June-2020.pdf.
Wikipedia
{{cite report |last1=Nicholas |first1=Simon |title=Thar Coal Locking Pakistan Into Unsustainable Capacity Payments |publisher=Institute for Energy Economics and Financial Analysis |date=June 2020 |url=https://ieefa.org/sites/default/files/2022-05/Thar-Coal-Locking-Pakistan-Into-Unsustainable-Capacity-Payments_June-2020.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001976)}}
BibTeX
@techreport{nicholas2020thar, author = {Nicholas, Simon}, title = {{Thar Coal Locking Pakistan Into Unsustainable Capacity Payments}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2020}, month = jun, url = {https://ieefa.org/sites/default/files/2022-05/Thar-Coal-Locking-Pakistan-Into-Unsustainable-Capacity-Payments_June-2020.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001976} }

Full text

Collected · Record updated