Tackling Indonesia’s Nuclear Power Euphoria
Summary
This report argues that nuclear power is an unsuitable and risky option for Indonesia due to high costs, seismic vulnerability, and the availability of cheaper renewable alternatives. It finds that 97% of nuclear projects exceed their initial budgets, with an average cost overrun of US$1.3 billion per project.
Key insights
- Nuclear power is losing global market share as power markets shift toward more cost-competitive renewable energy and storage solutions.
- Nuclear projects are characterized by extreme cost and schedule overruns; approximately 97% of projects exceed their initial budgets, with an average overrun of US$1.3 billion and construction delays averaging 64% more time than projected.
- Indonesia's high seismic activity, including 127 active volcanoes and thousands of annual earthquakes, poses significant physical risks to nuclear plant operations and complicates the search for stable deep geological repositories for waste disposal.
- There is no globally established, economically viable permanent solution for high-level nuclear waste disposal, with most nations relying on temporary storage.
- Indonesia lacks the necessary governance mechanisms, independent oversight, and a third-party liability insurance scheme required to safely manage a nuclear value chain.
- Indonesia has vast untapped renewable energy potential—approximately 400 GW, of which only 2.5% has been utilized—which can meet future demand more cost-effectively than nuclear power.
- Adding inflexible, high-cost nuclear baseload power could worsen the financial position of the national power company, PT Perusahaan Listrik Negara (PLN), which is already struggling with overcapacity and costly long-term power purchase agreements (PPAs).
- Small Modular Reactors (SMRs), including the thorium molten salt reactor proposed by ThorCon, remain largely conceptual and untested, with the only operational SMR in Russia costing quadruple its original estimate and taking 12 years to build.
- Indonesia does not possess significant domestic uranium or thorium resources, meaning a pivot to nuclear would create energy dependency on external suppliers.
- Indonesian regulations cap nuclear accident liability at IDR 4 trillion (US$276 million) for large plants, with lower caps for smaller reactors, which is insufficient compared to the hundreds of billions of dollars cost of major disasters like Chernobyl and Fukushima.
Cite the original document
- APA
- Hamdi, E., & Chia, B. (2021). Tackling Indonesia’s Nuclear Power Euphoria. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Tackling-Indonesias-Nuclear-Power-Euphoria_June-2021.pdf
- Chicago
- Hamdi, Elrika, and Brenda Chia. Tackling Indonesia’s Nuclear Power Euphoria. Institute for Energy Economics and Financial Analysis, 2021. https://ieefa.org/sites/default/files/resources/Tackling-Indonesias-Nuclear-Power-Euphoria_June-2021.pdf.
- Wikipedia
- {{cite report |last1=Hamdi |first1=Elrika |last2=Chia |first2=Brenda |title=Tackling Indonesia’s Nuclear Power Euphoria |publisher=Institute for Energy Economics and Financial Analysis |date=June 2021 |url=https://ieefa.org/sites/default/files/resources/Tackling-Indonesias-Nuclear-Power-Euphoria_June-2021.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001967)}}
- BibTeX
- @techreport{hamdi2021tackling, author = {Hamdi, Elrika and Chia, Brenda}, title = {{Tackling Indonesia’s Nuclear Power Euphoria}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2021}, month = jun, url = {https://ieefa.org/sites/default/files/resources/Tackling-Indonesias-Nuclear-Power-Euphoria_June-2021.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001967} }