Small Modular Reactor Update: The Fading Promise of Low-Cost Power from UAMPS' SMR
Summary
The document finds that the target power price for the UAMPS NuScale SMR project has likely risen from $58 per MWh to between $90 and $100 per MWh, making it significantly less competitive than renewable energy and battery storage.
Key insights
- The target power price for the UAMPS carbon-free power plant (CFPP) has increased from an original target of $55 per MWh for 12 modules to $58 per MWh for six modules in 2021, and is now likely to range between $90 and $100 per MWh.
- The projected $90-$100 per MWh price includes a $1.4 billion U.S. Department of Energy subsidy and an Inflation Reduction Act (IRA) subsidy of approximately $30 per MWh; without these, the unsubsidized price would be substantially higher than $100 per MWh.
- The CFPP project faces significant subscription challenges, with only 101 MW of the 462 MW capacity signed up as of February 2022, which may hinder the ability to secure financing.
- The project is prone to further cost increases and delays, citing the Georgia Power Vogtle project as a precedent where all-in costs increased by 140% and reactors are over six years behind schedule.
- The CFPP is considered uneconomic compared to renewable resources and battery storage, which are expected to continue declining in cost over the next decade according to the National Renewable Energy Laboratory.
Cite the original document
- APA
- Institute for Energy Economics and Financial Analysis (2022). Small Modular Reactor Update: The Fading Promise of Low-Cost Power from UAMPS' SMR. https://ieefa.org/sites/default/files/2022-11/SMR%20Cost%20Fact%20Sheet.pdf
- Chicago
- Institute for Energy Economics and Financial Analysis. Small Modular Reactor Update: The Fading Promise of Low-Cost Power from UAMPS' SMR. 2022. https://ieefa.org/sites/default/files/2022-11/SMR%20Cost%20Fact%20Sheet.pdf.
- Wikipedia
- {{cite report |author=Institute for Energy Economics and Financial Analysis |title=Small Modular Reactor Update: The Fading Promise of Low-Cost Power from UAMPS' SMR |date=17 November 2022 |url=https://ieefa.org/sites/default/files/2022-11/SMR%20Cost%20Fact%20Sheet.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001942)}}
- BibTeX
- @techreport{instituteforenergyeconomicsandfinancialanalysis2022small, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{Small Modular Reactor Update: The Fading Promise of Low-Cost Power from UAMPS' SMR}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2022}, month = nov, url = {https://ieefa.org/sites/default/files/2022-11/SMR%20Cost%20Fact%20Sheet.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001942} }
Full text
Collected · Record updated