Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that PT Perusahaan Listrik Negara (PLN) is facing severe financial distress due to over-capacity and inflexible payment obligations to coal-fired IPPs, requiring government subsidies that could nearly double to IDR 170.2 trillion by 2022.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • PLN's financial stability is heavily dependent on the Ministry of Finance (MOF), with subsidies and compensation for independent power project (IPP) payments estimated to rise by 31.5% in 2020 to IDR 97.3 trillion (USD 6.5 billion), potentially reaching IDR 170.2 trillion (USD 11.4 billion) by 2022.
  • The current tariff model is insufficient for cost recovery; IEEFA estimates that tariffs would need to increase by over 30% just to meet operating costs, and by more than 50% to service debt and fund capital expenditure.
  • PLN's target of 23% renewable energy by 2025 is considered aspirational and unrealistic, as the company continues to prioritize fossil fuels, which will account for over 75% of the energy mix for the next decade, while cost-competitive renewables will make up no more than 3.7%.
  • PLN faces significant downside demand risks, with a projected 6.0% decline in 2020. Despite this, planners have maintained pre-COVID average annual growth projections of 5.2% for 2021-2029, which the report argues lacks credibility.
  • There is a disconnect between PLN's deteriorating fundamentals and its access to global capital markets, which is anchored by the sovereign rating. Moody's has quietly downgraded PLN's baseline credit score to Ba3, the lowest investment grade rating.
  • Cash preservation efforts in 2020 have led to cuts in capital expenditure (capex), which may jeopardize essential grid upgrades and system performance, particularly in Sumatera and Kalimantan where new large-capacity facilities will strain the grid.

Cite the original document

APA
Brown, M. (2020). Running Out of Options. Institute for Energy Economics and Financial Analysis. https://ieefa.org/wp-content/uploads/2020/10/Running-Out-of-Options_6-Questions-for-PLN_October-2020.pdf
Chicago
Brown, Melissa. Running Out of Options. Institute for Energy Economics and Financial Analysis, 2020. https://ieefa.org/wp-content/uploads/2020/10/Running-Out-of-Options_6-Questions-for-PLN_October-2020.pdf.
Wikipedia
{{cite report |last1=Brown |first1=Melissa |title=Running Out of Options |publisher=Institute for Energy Economics and Financial Analysis |date=October 2020 |url=https://ieefa.org/wp-content/uploads/2020/10/Running-Out-of-Options_6-Questions-for-PLN_October-2020.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001917)}}
BibTeX
@techreport{brown2020running, author = {Brown, Melissa}, title = {{Running Out of Options}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2020}, month = oct, url = {https://ieefa.org/wp-content/uploads/2020/10/Running-Out-of-Options_6-Questions-for-PLN_October-2020.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001917} }

Full text

Collected · Record updated