The briefing finds that Bangladesh's target of 3,000 MW of rooftop solar by December 2025 is likely infeasible due to limited rooftop potential in targeted buildings and a highly compressed timeline. It argues that achieving the country's 2040 renewable energy goal of 30% requires better regulatory monitoring, quality assurance, and financial incentives.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The target of 3,000 MW of rooftop solar by December 2025 is considered infeasible because the combined sanctioned load of government offices, hospitals, educational, and religious institutions is significantly lower than 3,000 MW, limiting their potential under net metering guidelines.
  • Achieving the 3,000 MW target in less than six months would require scaling up installations to more than 12 times the capacity of 245 MW recorded in June 2025.
  • Many existing small-scale rooftop solar systems in Bangladesh have become stranded assets due to a lack of maintenance and poor quality components supplied by small vendors, which has created a negative perception among building owners.
  • The rooftop solar sector is hindered by high import duties on components such as FRP walkways, mounting structures, and DC cables, and a current cap on installation capacity limited to 70% of the sanctioned load.
  • Financial institutions are cautious about providing debt capital for rooftop solar projects due to perceived risks and high collateral requirements, while the complex disbursement process for low-cost green funds further deters investment.
  • The government's strategy involves a CAPEX model for government offices using public funds and an OPEX model for hospitals, educational, and religious institutions where EPC companies invest.
  • The OPEX model in rural areas faces risks from frequent load-shedding, as net-metering systems cannot transport electricity to the grid during power outages, increasing risk for EPC investors.

Cite the original document

APA
Alam, S. (2025). Rooftop Solar’s Time to Shine in Bangladesh. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2025-08/Rooftop%20Solar%E2%80%99s%20Time%20to%20Shine%20in%20Bangladesh%20%20%281%29.pdf
Chicago
Alam, Shafiqul. Rooftop Solar’s Time to Shine in Bangladesh. Institute for Energy Economics and Financial Analysis, 2025. https://ieefa.org/sites/default/files/2025-08/Rooftop%20Solar%E2%80%99s%20Time%20to%20Shine%20in%20Bangladesh%20%20%281%29.pdf.
Wikipedia
{{cite report |last1=Alam |first1=Shafiqul |title=Rooftop Solar’s Time to Shine in Bangladesh |publisher=Institute for Energy Economics and Financial Analysis |date=August 2025 |url=https://ieefa.org/sites/default/files/2025-08/Rooftop%20Solar%E2%80%99s%20Time%20to%20Shine%20in%20Bangladesh%20%20%281%29.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001914)}}
BibTeX
@techreport{alam2025rooftop, author = {Alam, Shafiqul}, title = {{Rooftop Solar’s Time to Shine in Bangladesh}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2025}, month = aug, url = {https://ieefa.org/sites/default/files/2025-08/Rooftop%20Solar%E2%80%99s%20Time%20to%20Shine%20in%20Bangladesh%20%20%281%29.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001914} }

Full text

Collected · Record updated