The Williams NESE Gas Pipeline Is Not Better the Second Time Around
Summary
The IEEFA concludes that the NESE gas pipeline is unnecessary because downstate New York does not face an urgent gas supply gap and the project's costs would likely outweigh any questionable electricity price benefits.
Key insights
- Downstate New York ratepayers would bear the construction costs, operation and maintenance costs, and the return-on-equity (ROE) profit for the NESE pipeline, with costs likely exceeding the $1.064 billion estimate due to construction inflation, potentially reaching $1.25 billion.
- The NESE project would provide no direct permanent jobs in New York, and only approximately 9% of the direct construction jobs would be located within the state, with the majority of profits going to the Tulsa-based Williams Company.
- There is no urgent need for additional gas infrastructure in downstate New York; a 2025 forecast suggests a supply-demand gap is unlikely to occur before 2041/42.
- The claim that the NESE pipeline would reduce statewide electricity costs is questionable, as EIA data shows a weak correlation (R-squared of 15%) between New York industrial electricity prices and the gas prices paid by electric utilities.
- The pipeline risks creating 'carbon lock-in,' where past investments in fossil fuel infrastructure make the transition to cleaner energy more difficult and incentivize policies that maintain the use of fossil fuels.
- The financial benefit for downstate ratepayers is not evident even under optimistic predictions, as the estimated costs of $2.16 to $2.59 billion would substantially offset the projected $2.75 billion in direct savings for residents in Zones J-K.
Cite the original document
- APA
- Mattei, S. (n.d.). The Williams NESE Gas Pipeline Is Not Better the Second Time Around. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2025-09/REVIEWED_NESE%20Redux_September%202025.pdf
- Chicago
- Mattei, Suzanne. The Williams NESE Gas Pipeline Is Not Better the Second Time Around. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2025-09/REVIEWED_NESE%20Redux_September%202025.pdf.
- Wikipedia
- {{cite report |last1=Mattei |first1=Suzanne |title=The Williams NESE Gas Pipeline Is Not Better the Second Time Around |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2025-09/REVIEWED_NESE%20Redux_September%202025.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001898)}}
- BibTeX
- @techreport{matteindwilliams, author = {Mattei, Suzanne}, title = {{The Williams NESE Gas Pipeline Is Not Better the Second Time Around}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2025-09/REVIEWED_NESE%20Redux_September%202025.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001898} }
Full text
Collected · Record updated