The briefing note critiques the recent surge in announcements regarding small modular reactors (SMRs) by tech companies like Google and Amazon, asserting that these technologies are unproven, financially risky, and will not be commercially viable until after 2030. It highlights significant hurdles including the lack of NRC licensing, a shortage of high-assay low enriched uranium (HALEU) fuel, and complex grid interconnection processes. The authors contrast these challenges with the rapid deployment and lower costs of solar, battery storage, and geothermal energy, which they argue are the only viable near-term solutions for the growing power needs of the AI sector.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Small modular reactors (SMRs) cannot meet the immediate electricity demand growth driven by AI and data centers, as they are not expected to be commercially viable at scale until the latter part of the next decade.
  • SMR projects face critical technical and regulatory barriers, specifically the lack of full licensing from the Nuclear Regulatory Commission (NRC) and a severe shortage of high-assay low enriched uranium (HALEU) fuel in the U.S.
  • The cost of SMRs is significantly higher than other clean energy alternatives; IEEFA tracks SMR costs at over $10,000/kW, whereas a geothermal project by Fervo is estimated at $3,200 per kilowatt.
  • The partnership between Google and Kairos Power aims for 500 MW of capacity by 2035, but the document notes Kairos has a "miniscule balance sheet" and no prior nuclear construction or operational experience.
  • Amazon's plan to bring 5 GW of X-energy SMR technology online by 2039 relies on high temperature gas reactor (HTGR) technology, which the document claims has a mixed history, citing a U.S. facility that never exceeded a 30% annual capacity factor.
  • Solar and battery storage projects are being deployed much faster than nuclear options, with some projects moving from financing to commercial operation in as little as 11 months.

Cite the original document

APA
Wamsted, D., & Schlissel, D. (2024). Nuclear Hype Ignores High Cost, Long Timelines. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2024-11/REVIEWED-14826-Briefing%20Note_Nuclear%20Hype%20and%20Reality_Final.pdf
Chicago
Wamsted, Dennis, and David Schlissel. Nuclear Hype Ignores High Cost, Long Timelines. Institute for Energy Economics and Financial Analysis, 2024. https://ieefa.org/sites/default/files/2024-11/REVIEWED-14826-Briefing%20Note_Nuclear%20Hype%20and%20Reality_Final.pdf.
Wikipedia
{{cite report |last1=Wamsted |first1=Dennis |last2=Schlissel |first2=David |title=Nuclear Hype Ignores High Cost, Long Timelines |publisher=Institute for Energy Economics and Financial Analysis |date=November 2024 |url=https://ieefa.org/sites/default/files/2024-11/REVIEWED-14826-Briefing%20Note_Nuclear%20Hype%20and%20Reality_Final.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001894)}}
BibTeX
@techreport{wamsted2024nuclear, author = {Wamsted, Dennis and Schlissel, David}, title = {{Nuclear Hype Ignores High Cost, Long Timelines}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2024}, month = nov, url = {https://ieefa.org/sites/default/files/2024-11/REVIEWED-14826-Briefing%20Note_Nuclear%20Hype%20and%20Reality_Final.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001894} }

Full text

Collected · Record updated