Decarbonisation readiness in India’s steel sector
Summary
The report finds a significant gap between the ambitious net-zero targets of Indian steel companies and their actual operational and financial readiness, with emissions intensity worsening for most Indian firms between FY2022 and FY2025.
Key insights
- There is a widening gap between the headline climate commitments of India's major steel companies and their progress in building the operational, technological, and financial infrastructure needed for decarbonisation.
- Financial alignment is the weakest area of readiness globally; no company in the sample of seven Indian producers and three global peers scored above 43%, showing that capital allocation has not kept pace with climate strategies.
- Emissions intensity for most Indian steel companies worsened between FY2022 and FY2025, despite the widespread adoption of Paris-aligned net-zero targets during this period.
- While five of seven Indian companies have adopted Paris-aligned net-zero targets for 2050, most lack the analytical infrastructure to stress-test these commitments through scenario analysis.
- India's steel sector faces significant carbon lock-in, with 43 million tonnes per annum (MTPA) of blast furnace capacity due for relining before 2030; conventional relining will lock in coal-based emissions into the 2040s.
- Cumulative carbon emissions from the operating, announced, and under-construction capacities of the seven assessed Indian steel majors are estimated at 33.7 gigatonnes (Gt) through 2070, assuming one conventional reline cycle.
- A structural divide exists within India, where public sector undertakings like SAIL and RINL show minimal evidence of transition planning compared to private producers like JSW Steel and Tata Steel.
- The economics of green steel are currently unviable without substantial public support; global public subsidies per tonne of CO2 abated range from USD110 to USD1,168, far exceeding current carbon prices.
- Tata Steel and JSW Steel lead Indian producers in pilot project coverage, with pilots covering approximately 20% and 18% of their projected capacity additions, respectively, though they trail global peers in committed near-zero steelmaking capacity.
Cite the original document
- APA
- Institute for Energy Economics and Financial Analysis (n.d.). Decarbonisation readiness in India’s steel sector. https://ieefa.org/sites/default/files/2026-04/Report%20-%20Decarbonisation%20readiness%20in%20India%E2%80%99s%20steel%20sector.pdf
- Chicago
- Institute for Energy Economics and Financial Analysis. Decarbonisation readiness in India’s steel sector. n.d. https://ieefa.org/sites/default/files/2026-04/Report%20-%20Decarbonisation%20readiness%20in%20India%E2%80%99s%20steel%20sector.pdf.
- Wikipedia
- {{cite report |author=Institute for Energy Economics and Financial Analysis |title=Decarbonisation readiness in India’s steel sector |url=https://ieefa.org/sites/default/files/2026-04/Report%20-%20Decarbonisation%20readiness%20in%20India%E2%80%99s%20steel%20sector.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001886)}}
- BibTeX
- @techreport{instituteforenergyeconomicsandfinancialanalysisnddecarbonisation, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{Decarbonisation readiness in India’s steel sector}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2026-04/Report%20-%20Decarbonisation%20readiness%20in%20India%E2%80%99s%20steel%20sector.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001886} }
Full text
Collected · Record updated