Proposed NESE Gas Pipeline in New York: A Bad Bargain for Ratepayers and Taxpayers

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

This report concludes that the $1-billion NESE gas pipeline is not needed to meet current or future demand in downstate New York. It finds that National Grid's demand projections are unrealistic and that non-pipeline alternatives are more cost-effective and sustainable.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • National Grid's 'Design Day' load forecast, used to justify the pipeline, is based on a hypothetical extreme cold day (0°F) that has not occurred in downstate New York since 1934.
  • Actual peak gas demand in recent winters has remained well below National Grid's existing Design Day system capacity, meaning the pipeline would primarily provide costly excess capacity for most of the year.
  • National Grid's projections of a 1.8% annual increase in gas demand are inconsistent with trends from Con Edison, the EIA, and local population declines in Long Island and New York City.
  • Climate change is expected to reduce winter gas demand; a Con Edison study suggests overall warmer winters could lead to a 33% decrease in gas sales by 2050 and a 49% decrease by 2080.
  • The argument that natural gas is a lower-emission alternative to oil is challenged by new data showing urban methane emissions are roughly twice what the EPA reports.
  • The NESE pipeline would initially be used to replace existing contractual 'City Gate Peaking Supplies', rather than meeting an urgent unmet need.
  • Ratepayers face significant financial risk from an outdated FERC rate of return (15.34%) and potential construction cost overruns, which National Grid has not disclosed.
  • New York's industrial and commercial sectors are becoming more energy-efficient, with the state ranking 50th in the nation for energy used per unit of Gross State Product in the industrial sector.
  • A required 2019 management and operations audit of National Grid is missing because the contracted consultant failed to meet professional standards, leaving a gap in critical oversight.

Cite the original document

APA
Mattei, S., Sanzillo, T., & Stix, M. (2020). Proposed NESE Gas Pipeline in New York: A Bad Bargain for Ratepayers and Taxpayers. Institute for Energy Economics and Financial Analysis. https://ieefa.org/wp-content/uploads/2020/04/Proposed-NESE-Gas-Pipeline-a-Bad-Bargain_April-2020.pdf
Chicago
Mattei, Suzanne, Tom Sanzillo, and Margaret Stix. Proposed NESE Gas Pipeline in New York: A Bad Bargain for Ratepayers and Taxpayers. Institute for Energy Economics and Financial Analysis, 2020. https://ieefa.org/wp-content/uploads/2020/04/Proposed-NESE-Gas-Pipeline-a-Bad-Bargain_April-2020.pdf.
Wikipedia
{{cite report |last1=Mattei |first1=Suzanne |last2=Sanzillo |first2=Tom |last3=Stix |first3=Margaret |title=Proposed NESE Gas Pipeline in New York: A Bad Bargain for Ratepayers and Taxpayers |publisher=Institute for Energy Economics and Financial Analysis |date=April 2020 |url=https://ieefa.org/wp-content/uploads/2020/04/Proposed-NESE-Gas-Pipeline-a-Bad-Bargain_April-2020.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001846)}}
BibTeX
@techreport{mattei2020proposed, author = {Mattei, Suzanne and Sanzillo, Tom and Stix, Margaret}, title = {{Proposed NESE Gas Pipeline in New York: A Bad Bargain for Ratepayers and Taxpayers}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2020}, month = apr, url = {https://ieefa.org/wp-content/uploads/2020/04/Proposed-NESE-Gas-Pipeline-a-Bad-Bargain_April-2020.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001846} }

Full text

Collected · Record updated