Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The Tennessee Valley Authority's decision to close the Paradise Unit 3 coal plant is economically sound because the facility's production costs exceed market prices and it requires significant capital investment for repairs and environmental compliance.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Paradise Unit 3's production costs in the 2018 fiscal year, including capital expenditures and non-capital production costs, exceeded $76 per megawatt-hour (MWh), which was higher than the Tennessee Valley Authority's (TVA) system-wide wholesale rate.
  • Maintaining the plant would require substantial capital investments, including over $200 million for generation equipment repairs and an estimated $212 million for environmental compliance with USEPA Coal Combustion Residual (CCR) and Effluent Limitation Guidelines (ELG) rules between FY2019 and FY2023.
  • The plant's reliability has declined significantly, with its equivalent forced outage rate (EFOR) reaching 14.53%, 32.09%, and over 20% in the three years preceding November 2018, placing it in the bottom quartile of the U.S. coal fleet for forced outage occurrences.
  • Paradise Unit 3 is uncompetitive compared to energy market prices in MISO and PJM hubs, and this gap is expected to widen as production costs increase while forward market prices remain flat through 2028.
  • The need for the plant's baseload power has diminished because TVA has added over 3,800MW of natural gas combined cycle (NGCC) generation and expanded nuclear capacity at Watts Bar and Browns Ferry.
  • TVA projects no growth in energy demand through 2038, meaning the plant's capacity is no longer required to meet the load.

Cite the original document

APA
Wamsted, D., & Schlissel, D. (2019). Problems in Paradise. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Problems-in-Paradise_June-2019.pdf
Chicago
Wamsted, Dennis, and David Schlissel. Problems in Paradise. Institute for Energy Economics and Financial Analysis, 2019. https://ieefa.org/sites/default/files/resources/Problems-in-Paradise_June-2019.pdf.
Wikipedia
{{cite report |last1=Wamsted |first1=Dennis |last2=Schlissel |first2=David |title=Problems in Paradise |publisher=Institute for Energy Economics and Financial Analysis |date=June 2019 |url=https://ieefa.org/sites/default/files/resources/Problems-in-Paradise_June-2019.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001841)}}
BibTeX
@techreport{wamsted2019problems, author = {Wamsted, Dennis and Schlissel, David}, title = {{Problems in Paradise}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2019}, month = jun, url = {https://ieefa.org/sites/default/files/resources/Problems-in-Paradise_June-2019.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001841} }

Full text

Collected · Record updated