This report argues that Indonesia's industrial digitalisation roadmap is undermined by an outdated electricity grid and a lack of transparency in PLN's operations. It finds that the current reliance on inflexible coal power plants is incompatible with the future needs of a digital economy.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The 'Making Indonesia 4.0' roadmap focuses on five economic sectors—food and beverage, clothing and textiles, automotive, petrochemicals, and electronics—but ignores the fundamental need for a modern, efficient, and reliable electricity system.
  • PLN's transmission and distribution networks are struggling to maintain stable electricity supplies in high-load density areas such as Jakarta, Bandung, and Surabaya, with voltage levels often falling below normal limits, which hinders the use of advanced electronics.
  • Outside of Java and Bali, energy dispatch operations are still performed manually, creating a barrier to the expected digital transition.
  • PLN's electricity planning is overly dependent on inflexible coal-fired power plants, which is unsuitable for a digital future where electricity demand can fluctuate rapidly.
  • There is a significant lack of transparency regarding the cost of production (BPP) and transmission and distribution data, which creates an uneven playing field for investors and benefits the national coal industry.
  • The cost of producing electricity from solar energy is expected to reach grid parity with coal in Indonesia within 2 to 3 years, and global trends show solar auction prices are already lower than PLN's coal-dependent production costs.
  • Distributed energy technology, specifically solar and pumped hydro storage, is identified as a potentially optimal solution for Indonesia's mountainous landscape and land availability.
  • To address the monopoly and inefficiency of the state utility, the report proposes three solutions: establishing an independent oversight body, creating competition for PLN via another state-owned enterprise, or privatising PLN as a public company.

Cite the original document

APA
Hamdi, E. (2018). Perencanaan yang Salah Kaprah. Institute for Energy Economics and Financial Analysis. https://ieefa.org/wp-content/uploads/2018/09/Perencanaan-yang-Salah-Kaprah_September-2018.pdf
Chicago
Hamdi, Elrika. Perencanaan yang Salah Kaprah. Institute for Energy Economics and Financial Analysis, 2018. https://ieefa.org/wp-content/uploads/2018/09/Perencanaan-yang-Salah-Kaprah_September-2018.pdf.
Wikipedia
{{cite report |last1=Hamdi |first1=Elrika |title=Perencanaan yang Salah Kaprah |publisher=Institute for Energy Economics and Financial Analysis |date=September 2018 |url=https://ieefa.org/wp-content/uploads/2018/09/Perencanaan-yang-Salah-Kaprah_September-2018.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001793)}}
BibTeX
@techreport{hamdi2018perencanaan, author = {Hamdi, Elrika}, title = {{Perencanaan yang Salah Kaprah}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2018}, month = sep, url = {https://ieefa.org/wp-content/uploads/2018/09/Perencanaan-yang-Salah-Kaprah_September-2018.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001793} }

Full text

Collected · Record updated