Overestimated Financial Viability of India’s Coal-fired Power Plants
Summary
This briefing by IEEFA finds that India's coal-fired power project pipeline carries massive underutilisation risk because LCOE calculations rely on constant, high capacity factors that ignore a global and domestic trend of declining utilisation rates.
Key insights
- India has 33 GW of coal-fired power plants currently under construction and an additional 29 GW of proposed projects awaiting regulatory approval.
- LCOE calculations for coal plants in India typically assume a utilisation factor of 85-90% over the project's life, but using the actual average capacity utilisation factor of approximately 55% increases the LCOE by 64%.
- Solar power in India has become cheaper than the variable cost of coal-fired power, with tariffs reaching a record low of Rs1.99/kWh (US$20/MWh) in December 2020.
- Rising coal transportation costs via Indian Railways, driven by cross-subsidy burdens from passenger freight, increase the landed tariff of electricity; for plants hauling coal from 1,200km away, the incremental impact is Rs1.78/kWh.
- Global trends show declining capacity factors for coal power in China, the UK, and the US, with China's capacity factor dropping from 61% in 2007 to 49% in 2019.
- The use of constant capacity factors creates a 'financial bubble' where coal assets are overvalued, increasing the risk of stranded assets and liquidity crunches that affect the wider power distribution sector and financial institutions in India.
Cite the original document
- APA
- Shah, K. (2021). Overestimated Financial Viability of India’s Coal-fired Power Plants. Institute for Energy Economics and Financial Analysis. https://ieefa.org/wp-content/uploads/2021/07/Overestimated-Viability-of-Indias-Coalfired-Plants_July-2021.pdf
- Chicago
- Shah, Kashish. Overestimated Financial Viability of India’s Coal-fired Power Plants. Institute for Energy Economics and Financial Analysis, 2021. https://ieefa.org/wp-content/uploads/2021/07/Overestimated-Viability-of-Indias-Coalfired-Plants_July-2021.pdf.
- Wikipedia
- {{cite report |last1=Shah |first1=Kashish |title=Overestimated Financial Viability of India’s Coal-fired Power Plants |publisher=Institute for Energy Economics and Financial Analysis |date=July 2021 |url=https://ieefa.org/wp-content/uploads/2021/07/Overestimated-Viability-of-Indias-Coalfired-Plants_July-2021.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001775)}}
- BibTeX
- @techreport{shah2021overestimated, author = {Shah, Kashish}, title = {{Overestimated Financial Viability of India’s Coal-fired Power Plants}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2021}, month = jul, url = {https://ieefa.org/wp-content/uploads/2021/07/Overestimated-Viability-of-Indias-Coalfired-Plants_July-2021.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001775} }
Full text
Collected · Record updated