Summary
The IEEFA submits that the Kurri Kurri Lateral Pipeline project should be rejected, primarily because the proposed gas storage system is not hydrogen compatible, contradicting Snowy Hydro's claims that the plant is 'hydrogen ready'.
Key insights
- The Kurri Kurri Gas power project is not 'hydrogen ready' because the gas storage system proposed in the Kurri Kurri Lateral pipeline Environmental Impact Statement (EIS) is not hydrogen compatible. The EIS explicitly states that constructing a storage pipeline capable of storing hydrogen blended fuel would require a significant increase in capital expenditure to mitigate pipeline material embrittlement, which Snowy Hydro deemed uneconomic.
- Snowy Hydro has provided misleading information to the Australian Senate and the public regarding the plant's ability to use hydrogen. While the company's website and Senate testimony claimed the plant could run on 15% to 30% hydrogen without upgrades, the lack of hydrogen-compatible infrastructure makes this impossible.
- The costs of the gas lateral and storage system have increased significantly from an initial 'ballpark' estimate of $100 million provided to the Senate in October 2021 to $264 million. This $264 million figure is considered an underestimate as it does not include financing costs and the profit margin for APA, the asset owner from whom Snowy Hydro will lease the system.
Cite the original document
- APA
- Robertson, B. (2022). Submission to the Kurri Kurri Lateral Pipeline project – Environmental Impact Statement Executive Summary. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2022-06/Kurri%20Kurri%20lateral%20pipeline%20project_May%202022.pdf
- Chicago
- Robertson, Bruce. Submission to the Kurri Kurri Lateral Pipeline project – Environmental Impact Statement Executive Summary. Institute for Energy Economics and Financial Analysis, 2022. https://ieefa.org/sites/default/files/2022-06/Kurri%20Kurri%20lateral%20pipeline%20project_May%202022.pdf.
- Wikipedia
- {{cite press release |last1=Robertson |first1=Bruce |title=Submission to the Kurri Kurri Lateral Pipeline project – Environmental Impact Statement Executive Summary |publisher=Institute for Energy Economics and Financial Analysis |date=May 2022 |url=https://ieefa.org/sites/default/files/2022-06/Kurri%20Kurri%20lateral%20pipeline%20project_May%202022.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001686)}}
- BibTeX
- @misc{robertson2022submission, author = {Robertson, Bruce}, title = {{Submission to the Kurri Kurri Lateral Pipeline project – Environmental Impact Statement Executive Summary}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2022}, month = may, url = {https://ieefa.org/sites/default/files/2022-06/Kurri%20Kurri%20lateral%20pipeline%20project_May%202022.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001686} }
Full text
Collected · Record updated