The report concludes that the Khurja Power Project is a likely stranded asset due to its high projected electricity costs compared to cheap renewables and its failure to meet current energy market needs. IEEFA estimates the plant's electricity would cost at least Rs5.67/kWh, far exceeding current solar tariffs of below Rs3.00/kWh.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Khurja project's estimated electricity cost is significantly higher than current renewable energy tariffs. While developers estimate Rs4.88/kWh, IEEFA calculates a more realistic cost of at least Rs5.67/kWh when accounting for coal freight, price inflation, and lower capacity factors.
  • The project is financially unviable compared to solar and wind generation, which have seen tariffs fall below Rs3.00/kWh with zero indexation for 25 years. Proceeding with the project would effectively require a taxpayer-sponsored subsidy of approximately Rs6,946 crore (US$10bn) over 25 years.
  • The project faces severe legal and environmental challenges, including disputes over land acquisition compensation in the Allahabad High Court and challenges to its Environmental Clearance before the National Green Tribunal.
  • The coal supply for the plant, intended to come from the Amelia coal block in Madhya Pradesh, is at high risk because the Ministry of Environment, Forest and Climate Change (MoEFCC) has classified the block as 'inviolate'.
  • The project is redundant because Uttar Pradesh already has 7.4 GW of coal-fired capacity under construction, which exceeds the state's long-term demand needs. IEEFA's model suggests that if solar goals are met, the state's coal-fired fleet will operate at sub-optimal capacity factors of 63% or lower.
  • The project's reliance on financing from the Power Finance Corporation (PFC) increases the risk of further stranded assets for the lender, which already has stressed coal project loans totaling Rs31,000 crore (US$4.5bn), or 11% of its total loan book.
  • The plant's location near the National Capital Territory of Delhi poses a significant air pollution risk, which may lead to stricter emissions regulations and the need for expensive retrofit equipment, further damaging its economics.
  • India's broader coal pipeline is shrinking, with NTPC Ltd shelving 13 GW of coal-fired power plants in 2018 due to slower demand growth and state requests to cancel Power Purchase Agreements (PPAs).

Cite the original document

APA
Buckley, T., Shah, K., & Garg, V. (2018). The Khurja Power Project. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Khurja-Thermal-Power-Project_10.2018.pdf
Chicago
Buckley, Tim, Kashish Shah, and Vibhuti Garg. The Khurja Power Project. Institute for Energy Economics and Financial Analysis, 2018. https://ieefa.org/sites/default/files/resources/Khurja-Thermal-Power-Project_10.2018.pdf.
Wikipedia
{{cite report |last1=Buckley |first1=Tim |last2=Shah |first2=Kashish |last3=Garg |first3=Vibhuti |title=The Khurja Power Project |publisher=Institute for Energy Economics and Financial Analysis |date=October 2018 |url=https://ieefa.org/sites/default/files/resources/Khurja-Thermal-Power-Project_10.2018.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001683)}}
BibTeX
@techreport{buckley2018khurja, author = {Buckley, Tim and Shah, Kashish and Garg, Vibhuti}, title = {{The Khurja Power Project}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2018}, month = oct, url = {https://ieefa.org/sites/default/files/resources/Khurja-Thermal-Power-Project_10.2018.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001683} }

Full text

Collected · Record updated