The Keystone XL pipeline is deemed obsolete and financially unviable because existing U.S. pipeline expansions and the Capline reversal have already replaced its intended capacity, while demand for heavy oil is falling.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The cancellation of the Keystone XL pipeline was considered credit-positive for its sponsor, TC Energy, as it reduced the company's execution risk and made its capital program and financial obligations more manageable.
  • The outlook for production growth in Canada's oil sands has declined significantly since 2014, with projections for 2030 dropping from 4.5 million b/d in 2014 to an estimated range of just over 3 million b/d currently.
  • Between 2019 and 2021, five major oil sands projects were cancelled, deferred, or delayed, and approximately 70 percent of planned production growth is considered at risk.
  • The rise of electric vehicles (EVs) threatens the future of the gasoline market, which represents about 44 percent of the total U.S. oil market and is a primary end use for heavy oil from Canadian oil sands.
  • U.S. pipeline companies have replaced the capacity targeted by Keystone XL through a combination of smaller projects and the reversal of the Capline pipeline, which can move 1.2 million b/d of crude oil from the Midwest to the Gulf Coast.
  • Large-scale greenfield oil sands projects are increasingly difficult to develop due to regulatory risks and Canada's climate goals, including a target to reduce carbon emissions from the oil and gas sector by 81 million tons annually by 2030.
  • Alberta taxpayers suffered a loss of $394 million in equity and were required to pay back $1 billion in guaranteed loans following the failure of the Keystone XL project.

Cite the original document

APA
Mawji, O., & Mattei, S. (2022). Why the Now-abandoned Keystone XL Pipeline Was Troubled From the Start and Today Would Not Serve Its Purpose. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2022-06/Keystone%20XL%20Pipeline%20Troubled%20From%20the%20Start_June%202022_0.pdf
Chicago
Mawji, Omar, and Suzanne Mattei. Why the Now-abandoned Keystone XL Pipeline Was Troubled From the Start and Today Would Not Serve Its Purpose. Institute for Energy Economics and Financial Analysis, 2022. https://ieefa.org/sites/default/files/2022-06/Keystone%20XL%20Pipeline%20Troubled%20From%20the%20Start_June%202022_0.pdf.
Wikipedia
{{cite report |last1=Mawji |first1=Omar |last2=Mattei |first2=Suzanne |title=Why the Now-abandoned Keystone XL Pipeline Was Troubled From the Start and Today Would Not Serve Its Purpose |publisher=Institute for Energy Economics and Financial Analysis |date=June 2022 |url=https://ieefa.org/sites/default/files/2022-06/Keystone%20XL%20Pipeline%20Troubled%20From%20the%20Start_June%202022_0.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001682)}}
BibTeX
@techreport{mawji2022why, author = {Mawji, Omar and Mattei, Suzanne}, title = {{Why the Now-abandoned Keystone XL Pipeline Was Troubled From the Start and Today Would Not Serve Its Purpose}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2022}, month = jun, url = {https://ieefa.org/sites/default/files/2022-06/Keystone%20XL%20Pipeline%20Troubled%20From%20the%20Start_June%202022_0.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001682} }

Full text

Collected · Record updated