Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that Indonesia's state-owned utility, PLN, lacks the infrastructure and transparency needed to support the digital industrial revolution, urging a shift toward grid modernization and renewable energy.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • PLN's existing transmission and distribution infrastructure is inadequate for the high-level reliability and power quality required by the 'Making Indonesia 4.0' plan, with frequent power cuts and low voltage levels reported in high-load areas like Jakarta, Bandung, and Surabaya.
  • Outside of Java and Bali, energy dispatch operations are frequently performed manually, which hinders the digital transition of the power system.
  • There is a critical lack of transparency in the Indonesian electricity sector, specifically regarding the Biaya Pokok Produksi (BPP) data used to calculate tariffs and subsidies, which creates an uneven playing field for private investors.
  • PLN's reliance on inflexible coal-fired generation is economically outdated, as the cost of coal-dependent generation has remained above global solar bid prices for the last five years, and solar is expected to reach grid parity with coal in Indonesia within two to three years.
  • Distributed energy technologies, specifically solar PV and pumped hydro storage, are identified as highly suitable for Indonesia's mountainous landscape and land area, with solar potential capable of meeting total energy needs using only 0.1 percent of the land.
  • To resolve inefficiency and monopoly issues, the report proposes three options: establishing an independent oversight body, creating a state-owned competitor for PLN, or transitioning PLN into a publicly listed company.

Cite the original document

APA
Hamdi, E. (2018). A Foreseeable Planning Mismatch. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Indonesias-Industry-4.0-Plans_September-2018.pdf
Chicago
Hamdi, Elrika. A Foreseeable Planning Mismatch. Institute for Energy Economics and Financial Analysis, 2018. https://ieefa.org/sites/default/files/resources/Indonesias-Industry-4.0-Plans_September-2018.pdf.
Wikipedia
{{cite report |last1=Hamdi |first1=Elrika |title=A Foreseeable Planning Mismatch |publisher=Institute for Energy Economics and Financial Analysis |date=September 2018 |url=https://ieefa.org/sites/default/files/resources/Indonesias-Industry-4.0-Plans_September-2018.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001650)}}
BibTeX
@techreport{hamdi2018foreseeable, author = {Hamdi, Elrika}, title = {{A Foreseeable Planning Mismatch}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2018}, month = sep, url = {https://ieefa.org/sites/default/files/resources/Indonesias-Industry-4.0-Plans_September-2018.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001650} }

Full text

Collected · Record updated