46 Gigawatts of Proposed Coal-Fired Power Projects Cancelled in 12 Months, With 600 Gigawatts Cancelled Last Decade

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

India's coal-fired power project pipeline has shrunk significantly, with 46 GW of projects cancelled in a single year and 600 GW cancelled over the last decade, driven by the increasing economic competitiveness of renewables.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Between January 2019 and January 2020, India's pre-construction pipeline of coal-fired power projects was halved from 58 GW to 29 GW, with 46 GW of projects facing formal or informal cancellations during that 12-month period.
  • Over the last decade, a total of 600 GW of Indian coal-fired power project proposals have been cancelled.
  • The thermal power generation sector in India faces US$60 billion in financial stress, while the coal-fired project pipeline carries a stranded asset risk value of US$40 billion.
  • IEEFA projects that net new additions in the coal-fired sector will be only 30 GW by FY2029/30, which is approximately half of the 61 GW projected in the Central Electricity Authority's optimal generation draft report.
  • Major thermal power operators NTPC and Tata Power have decided to stop developing new coal-fired power projects, with NTPC limiting its activity to the completion of 10.8 GW of plants already under construction.

Cite the original document

APA
Shah, K. (2020). 46 Gigawatts of Proposed Coal-Fired Power Projects Cancelled in 12 Months, With 600 Gigawatts Cancelled Last Decade. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/India-46-gigawatts-of-coal-fired-power-projects-cancelled-in-12-months_Mar-2020.pdf
Chicago
Shah, Kashish. 46 Gigawatts of Proposed Coal-Fired Power Projects Cancelled in 12 Months, With 600 Gigawatts Cancelled Last Decade. Institute for Energy Economics and Financial Analysis, 2020. https://ieefa.org/sites/default/files/resources/India-46-gigawatts-of-coal-fired-power-projects-cancelled-in-12-months_Mar-2020.pdf.
Wikipedia
{{cite report |last1=Shah |first1=Kashish |title=46 Gigawatts of Proposed Coal-Fired Power Projects Cancelled in 12 Months, With 600 Gigawatts Cancelled Last Decade |publisher=Institute for Energy Economics and Financial Analysis |date=March 2020 |url=https://ieefa.org/sites/default/files/resources/India-46-gigawatts-of-coal-fired-power-projects-cancelled-in-12-months_Mar-2020.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001612)}}
BibTeX
@techreport{shah2020gigawatts, author = {Shah, Kashish}, title = {{46 Gigawatts of Proposed Coal-Fired Power Projects Cancelled in 12 Months, With 600 Gigawatts Cancelled Last Decade}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2020}, month = mar, url = {https://ieefa.org/sites/default/files/resources/India-46-gigawatts-of-coal-fired-power-projects-cancelled-in-12-months_Mar-2020.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001612} }

Full text

Collected · Record updated