IEEFA and CEF forecast that India will reach 405GW of renewable energy capacity by FY2029/30, with thermal power's generation share falling from 72.3% in FY2021/22 to 53.4% in FY2029/30.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • IEEFA and CEF forecast that India will add 35-40GW of renewable energy capacity annually through to fiscal year (FY) 2029/30, reaching a total of 405GW.
  • Thermal power is projected to lose market share in India, with its generation share expected to drop from 72.3% in FY2021/22 to 53.4% in FY2029/30.
  • Combined additional capacity targets through 2030 from top Indian utility players stand at approximately 231GW, which is nearly 100% of the country's incremental addition target of 233GW. Major contributors include NTPC (60GW), Adani Green Energy (45GW), and Tata Power, ReNew Power, and Acme Solar (25GW each).
  • India's green hydrogen target of 5 million tonnes per annum (MTPA) by 2030 is expected to require an additional renewable energy capacity of approximately 118GW.
  • The rooftop solar market in India has lagged behind the government's 40GW target for 2022, with installed capacity standing at 11GW as of the report's timeframe.
  • The KUSUM scheme for solar pumps targets 30.8GW of solar capacity in the agricultural sector, but progress has been slow, with only 16,570 pumps installed as of FY2021.
  • Non-power sector public sector undertakings (PSUs), including ONGC, IOC, BPCL, and GAIL, have a combined renewable capacity addition target of 16.5GW by 2030.
  • India has a potential to install approximately 195GW of offshore wind capacity along its 7,600 km coastline, although the segment is currently virtually non-existent.
  • Global utility leaders like NextEra Energy, RWE, Ørsted, and Enel have outperformed equity markets by adopting ambitious decarbonisation targets that do not rely on carbon offsets or carbon capture and storage (CCS).
  • Enel's capex budget for 2021-2030 is €210 billion, split between grid modernisation and renewable energy generation, aiming for a total equity capacity of 129GW by 2030.

Cite the original document

APA
Garg, V., Srivastava, S., & Buckley, T. (2022). India’s Renewable Energy Journey: Short-Term Hiccups but Long-Term Trajectory Intact. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2022-10/India%27s%20RE%20Journey_Oct2022.pdf
Chicago
Garg, Vibhuti, Shantanu Srivastava, and Tim Buckley. India’s Renewable Energy Journey: Short-Term Hiccups but Long-Term Trajectory Intact. Institute for Energy Economics and Financial Analysis, 2022. https://ieefa.org/sites/default/files/2022-10/India%27s%20RE%20Journey_Oct2022.pdf.
Wikipedia
{{cite report |last1=Garg |first1=Vibhuti |last2=Srivastava |first2=Shantanu |last3=Buckley |first3=Tim |title=India’s Renewable Energy Journey: Short-Term Hiccups but Long-Term Trajectory Intact |publisher=Institute for Energy Economics and Financial Analysis |date=October 2022 |url=https://ieefa.org/sites/default/files/2022-10/India%27s%20RE%20Journey_Oct2022.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001611)}}
BibTeX
@techreport{garg2022indias, author = {Garg, Vibhuti and Srivastava, Shantanu and Buckley, Tim}, title = {{India’s Renewable Energy Journey: Short-Term Hiccups but Long-Term Trajectory Intact}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2022}, month = oct, url = {https://ieefa.org/sites/default/files/2022-10/India%27s%20RE%20Journey_Oct2022.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001611} }

Full text

Collected · Record updated