Climate-resilient development in Uganda
Summary
The report argues that Uganda's planned oil refinery poses significant risks to public finances due to high debt and climate transition risks, suggesting that a diversified portfolio of smaller, electrified industrial projects would be a lower-risk path to development.
Key insights
- Uganda's public debt to GDP has risen above 50%, creating an elevated risk of debt distress and reducing fiscal space for essential spending on health and education as debt interest payments have doubled to over 30% of public revenues.
- The proposed oil refinery investment could cost the Ugandan government approximately USD1.8 billion for its 40% equity stake, nearly three times its contribution to the East Africa Crude Oil Pipeline (EACOP).
- To fund the refinery and other projects, the Uganda National Oil Company (UNOC) agreed to a loan of up to USD2 billion from Vitol, which grants the trader priority access to crude oil export revenues for repayment, potentially delaying other public spending.
- The refinery's financial viability is highly sensitive to cost overruns and climate transition; a 25% construction cost overrun would reduce the internal rate of return (IRR) to 10%, while a Net Zero Emissions (NZE) scenario could push the IRR down to 5%.
- A proposed tolling agreement with Alpha MBM Investments may transfer oil-price risk to Uganda, potentially forcing the government to either raise fuel prices above import parity or absorb refining losses if Brent prices fall below approximately USD43 per barrel.
- An alternative development strategy focusing on smaller, electrified industrialization projects in agriculture and modern energy services would offer lower risk and faster payback periods than the refinery.
- Uganda is the 14th most vulnerable country globally to climate change, facing significant risks from heat stress, unpredictable precipitation, and soil erosion, particularly in the agriculture sector.
- The Ugandan electricity system is vulnerable to climate change, as droughts and reduced river flows in the Nile Basin can sharply reduce hydropower output and increase the risk of load-shedding.
Cite the original document
- APA
- Institute for Energy Economics and Financial Analysis (2025). Climate-resilient development in Uganda. https://ieefa.org/sites/default/files/2026-01/IEEFAClimateResilientDevelopmentinUganda.pdf
- Chicago
- Institute for Energy Economics and Financial Analysis. Climate-resilient development in Uganda. 2025. https://ieefa.org/sites/default/files/2026-01/IEEFAClimateResilientDevelopmentinUganda.pdf.
- Wikipedia
- {{cite report |author=Institute for Energy Economics and Financial Analysis |title=Climate-resilient development in Uganda |date=October 2025 |url=https://ieefa.org/sites/default/files/2026-01/IEEFAClimateResilientDevelopmentinUganda.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001596)}}
- BibTeX
- @techreport{instituteforenergyeconomicsandfinancialanalysis2025climateresilient, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{Climate-resilient development in Uganda}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2025}, month = oct, url = {https://ieefa.org/sites/default/files/2026-01/IEEFAClimateResilientDevelopmentinUganda.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001596} }
Full text
Collected · Record updated