The report finds that Australia's C&I solar and storage sector is severely constrained by business-level investment barriers, inconsistent network tariffs, and slow grid connection processes, despite a technical rooftop potential of up to 86GW.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Australia's C&I solar capacity is currently 5.6GW, with forecasts suggesting it could reach 17–31GW by 2050, while the total technical rooftop potential (including rural/primary production) could be as high as 85.6GW.
  • C&I solar and storage can be deployed faster than utility-scale alternatives because they generally do not require extensive planning, environmental approvals, or new transmission build.
  • Business-level investment is hindered by 'bounded rationality,' where managers deprioritize energy investments as non-core business expenditure, applying higher return thresholds than the actual cost of capital.
  • Tenancy arrangements create significant barriers because landlords, who are the final decision-makers, do not pay the energy bills and thus have limited incentive to approve solar and storage installations.
  • The C&I sector is described as the 'missing middle' of emissions policy, as projects are typically too large for residential incentives like the Cheaper Home Batteries Program but too small for the utility-scale Capacity Investment Scheme.
  • Network tariffs are fragmented and inconsistent across Australia's 16 distribution network service providers (DNSPs), with over 250 different business tariff codes in the National Electricity Market (NEM) alone.
  • Demand charges, which can account for up to 40% of business electricity bills, are applied inconsistently, with some networks using rolling 12-month maximums that make it difficult for batteries to reduce costs without sustained performance.
  • The grid connection process for C&I projects (30kW–5MW) is slow and unpredictable, with typical timelines ranging from 8-11 months and often involving iterative loops of information requests.
  • Technical requirements for grid connection vary significantly between DNSPs, particularly regarding remote monitoring, active power curtailment, and ramp rate limits, which increases costs and risks of non-compliance.
  • The Regulatory Investment Test for Distribution (RIT-D) process is not conducive to C&I competition, as it is often bypassed by DNSPs or operates on timeframes that do not align with business investment cycles.

Cite the original document

APA
Bowyer, J., & Edis, T. (n.d.). Unlocking the clean energy potential of Australian business rooftops. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2026-06/IEEFA_Unlocking%20the%20clean%20energy%20potential%20of%20Australian%20business%20rooftops_Jun2026_2.pdf
Chicago
Bowyer, Johanna, and Tristan Edis. Unlocking the clean energy potential of Australian business rooftops. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2026-06/IEEFA_Unlocking%20the%20clean%20energy%20potential%20of%20Australian%20business%20rooftops_Jun2026_2.pdf.
Wikipedia
{{cite report |last1=Bowyer |first1=Johanna |last2=Edis |first2=Tristan |title=Unlocking the clean energy potential of Australian business rooftops |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2026-06/IEEFA_Unlocking%20the%20clean%20energy%20potential%20of%20Australian%20business%20rooftops_Jun2026_2.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001589)}}
BibTeX
@techreport{bowyerndunlocking, author = {Bowyer, Johanna and Edis, Tristan}, title = {{Unlocking the clean energy potential of Australian business rooftops}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2026-06/IEEFA_Unlocking%20the%20clean%20energy%20potential%20of%20Australian%20business%20rooftops_Jun2026_2.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001589} }

Full text

Collected · Record updated