The report finds that Indonesia's push for mine-mouth coal power has led to opaque procurement, underestimated transmission costs, and systemic grid vulnerabilities, as exemplified by the massive August 2019 Java blackout.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The August 2019 Java blackout, which affected nearly 100 million people and lasted over six hours in Jakarta, West Java, and Banten, was caused by PLN's lack of system-level planning and slow emergency response.
  • The Ministry of Energy and Mineral Resources (MEMR) Regulation No 19/2017 allowed PLN to use a direct appointment system for mine-mouth power projects, which increased the speed of approvals but reduced competition, transparency, and performance.
  • PLN's planning for mine-mouth projects often ignores the high cost of transmission infrastructure; for example, connecting the Jambi-1, Jambi-2, and Riau-1 plants is estimated to cost at least IDR 4.41 trillion (USD 311 million).
  • The Riau-1 project case study reveals significant financial risks and a lack of due diligence, as the project sponsor, BlackGold Natural Resources Ltd. (BNR), had a very limited capital base and a history of losses totaling USD 40.2 million from 2014-2017.
  • The Banyuasin 240MW project demonstrates a lack of PLN oversight, with the project remaining unbuilt years after its 2007 PPA and involving a complex, opaque trail of ownership changes including China Oceanwide Holdings Limited.
  • Indonesia's emission standards for coal-based plants are significantly lower than those in the EU, US, China, and India, which biases the market toward high-pollution generation options.
  • The report recommends that the Indonesian government conduct a full system audit of PLN, enact system-level reforms, increase competition in procurement, make the national electricity planning document (RUPTL) more transparent, and establish an independent power regulatory body.

Cite the original document

APA
Hamdi, E. (2019). The Case for System Transformation in Indonesia. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/IEEFA_The-Case-for-System-Transformation-in-Indonesia_November-2019.pdf
Chicago
Hamdi, Elrika. The Case for System Transformation in Indonesia. Institute for Energy Economics and Financial Analysis, 2019. https://ieefa.org/sites/default/files/resources/IEEFA_The-Case-for-System-Transformation-in-Indonesia_November-2019.pdf.
Wikipedia
{{cite report |last1=Hamdi |first1=Elrika |title=The Case for System Transformation in Indonesia |publisher=Institute for Energy Economics and Financial Analysis |date=November 2019 |url=https://ieefa.org/sites/default/files/resources/IEEFA_The-Case-for-System-Transformation-in-Indonesia_November-2019.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001585)}}
BibTeX
@techreport{hamdi2019case, author = {Hamdi, Elrika}, title = {{The Case for System Transformation in Indonesia}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2019}, month = nov, url = {https://ieefa.org/sites/default/files/resources/IEEFA_The-Case-for-System-Transformation-in-Indonesia_November-2019.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001585} }

Full text

Collected · Record updated