Thailand's gas-to-power sector is characterized by significant overcapacity and underutilization, with seven gas plants costing the state and ratepayers THB159 billion since 2023 despite operating at capacity factors below 10% in 2025.
Key insights
- Seven privately owned gas-fired power plants in Thailand, totaling over 11 GW of capacity, operated with a capacity factor below 10% in 2025.
- Since 2023, the Electricity Generating Authority of Thailand (EGAT) and ratepayers have paid THB159 billion (USD5.02 billion) for seven underused gas plants.
- Thailand's government aims to add 6.3 GW of new gas-fired capacity by 2037, but many projects face delays or cancellations, including three tenders canceled by EGAT in 2025.
- Capital costs for gas turbines have nearly tripled in recent years, rising from USD700–1,000/kW to over USD2,400/kW, contributing to project delays and cancellations.
- Availability payments for idle gas plants are a significant cost; EGAT estimated that these payments accounted for THB0.63 per kWh, or nearly 17% of the base tariff rate of THB3.78/kWh for the first cycle of 2026.
- Thailand's updated Nationally Determined Contribution (NDC3.0), submitted on 4 November 2025, targets a 47% reduction in net emissions from 2019 levels by 2035 and net zero by 2050.
- The Draft Gas Plan 2024 projects that LNG imports could grow by 73% to supply 43% of gas requirements by 2037, or potentially grow 2.3 times current levels to supply 59% if exploration fails.
- Solar energy became the cheapest form of electricity in Thailand in 2022, with costs at the end of 2025 being less than half of EGAT's average purchase price from gas and coal-fired IPPs.
- Thailand's reserve margin has significantly exceeded the 15% international standard for the last decade, peaking at over 70% in 2020 and remaining at 55% since.
Cite the original document
- APA
- Doleman, C., & Reynolds, S. (n.d.). Thailand’s gas conundrum: Overbuilt, underutilized, and increasingly expensive. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2026-03/IEEFA_Thailand%20gas%20conundrun%20report_updated%20March2026.pdf
- Chicago
- Doleman, Christopher, and Sam Reynolds. Thailand’s gas conundrum: Overbuilt, underutilized, and increasingly expensive. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2026-03/IEEFA_Thailand%20gas%20conundrun%20report_updated%20March2026.pdf.
- Wikipedia
- {{cite report |last1=Doleman |first1=Christopher |last2=Reynolds |first2=Sam |title=Thailand’s gas conundrum: Overbuilt, underutilized, and increasingly expensive |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2026-03/IEEFA_Thailand%20gas%20conundrun%20report_updated%20March2026.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001584)}}
- BibTeX
- @techreport{dolemanndthailands, author = {Doleman, Christopher and Reynolds, Sam}, title = {{Thailand’s gas conundrum: Overbuilt, underutilized, and increasingly expensive}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2026-03/IEEFA_Thailand%20gas%20conundrun%20report_updated%20March2026.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001584} }
Full text
Collected · Record updated