IEEFA argues that AEMO's energy system forecasts are overly conservative regarding rooftop solar and vehicle-to-grid (V2G) capacity, which risks over-estimating the need for large-scale generation and transmission.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • AEMO's rooftop PV forecasts are considered conservative because they use outdated projections that do not account for the trend of increasing system size, which is expected to grow from 8kW currently to around 12kW by 2054.
  • The technical potential for rooftop PV in Australia is significantly higher than AEMO's forecasts; while AEMO projects 71.5GW to 76.3GW by 2049-2050, updated estimates based on a 2019 report and a 45% increase in panel power density suggest a potential of 259GW and 354TWh.
  • AEMO likely underestimates vehicle-to-grid (V2G) capacity, forecasting no V2G capacity before 2030 and only 52.5GWh by FY2050, which represents only 2% of the 2,340GWh available EV storage depth forecast by consultancy enX.
  • The potential for flexible demand from domestic hot water systems is substantial; under a rapid electrification scenario, 22GW/45GWh of flexible demand could be available per day by 2040, roughly two-thirds of peak demand.
  • IEEFA recommends that AEMO remove direct hydrogen exports from core ISP scenarios as they do not appear to make financial sense, and instead focus on green hydrogen for domestic value-add products like green iron.
  • The current ISP process treats demand-side measures as inputs rather than co-optimising them with supply-side measures, which IEEFA argues should be implemented in the 2026 ISP to avoid over-estimating required large-scale infrastructure.

Cite the original document

APA
Bowyer, J., Gordon, J., Denis-Ryan, A., & Kuiper, D. G. (2024). Integrated System Plan needs greater ambition on DER. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2024-08/IEEFA%20Submission%20-%20AEMO%202025%20Draft%20IASR%20-%20August%202024.pdf
Chicago
Bowyer, Johanna, Jay Gordon, Amandine Denis-Ryan, and Dr Gabrielle Kuiper. Integrated System Plan needs greater ambition on DER. Institute for Energy Economics and Financial Analysis, 2024. https://ieefa.org/sites/default/files/2024-08/IEEFA%20Submission%20-%20AEMO%202025%20Draft%20IASR%20-%20August%202024.pdf.
Wikipedia
{{cite press release |last1=Bowyer |first1=Johanna |last2=Gordon |first2=Jay |last3=Denis-Ryan |first3=Amandine |last4=Kuiper |first4=Dr Gabrielle |title=Integrated System Plan needs greater ambition on DER |publisher=Institute for Energy Economics and Financial Analysis |date=13 August 2024 |url=https://ieefa.org/sites/default/files/2024-08/IEEFA%20Submission%20-%20AEMO%202025%20Draft%20IASR%20-%20August%202024.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001426)}}
BibTeX
@misc{bowyer2024integrated, author = {Bowyer, Johanna and Gordon, Jay and Denis-Ryan, Amandine and Kuiper, Dr Gabrielle}, title = {{Integrated System Plan needs greater ambition on DER}}, publisher = {Institute for Energy Economics and Financial Analysis}, year = {2024}, month = aug, url = {https://ieefa.org/sites/default/files/2024-08/IEEFA%20Submission%20-%20AEMO%202025%20Draft%20IASR%20-%20August%202024.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001426} }

Full text

Collected · Record updated