Can aging thermal power plants in Pakistan be revitalized?
Summary
The document argues that retrofitting aging thermal plants in Pakistan to use Thar coal is economically and logistically impractical compared to hybrid renewable energy systems, which offer comparable costs and shorter turnaround times.
Key insights
- Retrofitting Hub Power Company Limited (HUBCO), Pakistan's largest IPP, to run on Thar coal would result in a levelized cost of electricity (LCOE) between 5.9 and 6.7 USc/KWh, with estimated modification costs of at least one billion dollars.
- Transporting Thar coal to the Hub site is logistically untenable via road, as it would require a 40-tonne semi-truck to arrive every two minutes, 24 hours a day. Railway options are hindered by the lack of existing tracks to Hub and the potential for residential displacement during construction.
- Hybrid renewable energy systems combining solar, wind, and battery energy storage (BESS) provide a more viable alternative with an LCOE ranging from 5.3 to 7.7 USc/KWh and a capacity factor of up to 80%.
- Conversion of oil-based plants to coal is technically complex, requiring the replacement of the entire boiler section and the addition of coal handling, ash removal, and flue gas cleaning equipment; only the switchyard and steam turbines/generators would be salvageable.
Cite the original document
- APA
- Isaad, H. (2024). Can aging thermal power plants in Pakistan be revitalized? Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2024-05/IEEFA%20Briefing%20note_Can%20aging%20thermal%20power%20plants%20in%20Pakistan%20be%20revitalized%3F.pdf
- Chicago
- Isaad, Haneea. Can aging thermal power plants in Pakistan be revitalized? Institute for Energy Economics and Financial Analysis, 2024. https://ieefa.org/sites/default/files/2024-05/IEEFA%20Briefing%20note_Can%20aging%20thermal%20power%20plants%20in%20Pakistan%20be%20revitalized%3F.pdf.
- Wikipedia
- {{cite report |last1=Isaad |first1=Haneea |title=Can aging thermal power plants in Pakistan be revitalized? |publisher=Institute for Energy Economics and Financial Analysis |date=May 2024 |url=https://ieefa.org/sites/default/files/2024-05/IEEFA%20Briefing%20note_Can%20aging%20thermal%20power%20plants%20in%20Pakistan%20be%20revitalized%3F.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001339)}}
- BibTeX
- @techreport{isaad2024can, author = {Isaad, Haneea}, title = {{Can aging thermal power plants in Pakistan be revitalized?}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2024}, month = may, url = {https://ieefa.org/sites/default/files/2024-05/IEEFA%20Briefing%20note_Can%20aging%20thermal%20power%20plants%20in%20Pakistan%20be%20revitalized%3F.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001339} }
Full text
Collected · Record updated