The IEEFA report concludes that Formosa Plastics' proposed Louisiana petrochemical complex should be abandoned because a combination of global plastics oversupply, skyrocketing construction costs, and severe legal challenges regarding environmental racism have invalidated its original investment thesis.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Global market conditions for petrochemicals have shifted from favoring investment to a state of oversupply, which has driven prices down and is expected to keep downward pressure on prices through 2025.
  • IEEFA estimates that annual revenues for Phase One of the project will be approximately $2.5 billion, which is 20 percent lower than the $3.1 billion predicted in a 2018 consultant study used by Formosa.
  • Construction costs for the project have risen significantly, with the Taiwan Rating Service estimating the total cost at $12 billion, a 24 percent increase over Formosa's original 2018 estimate of $9.7 billion.
  • The project faces severe regulatory risks, including the suspension of its Clean Water Act permit by the U.S. Army Corps of Engineers and legal challenges to its air permit based on environmental racism.
  • The proposed site in St. James Parish is located in 'Cancer Alley,' an area with a predominantly Black population (91 percent in the immediate district) that is already heavily saturated with toxic pollution.
  • Long-term demand for virgin plastics is expected to decline due to increased investment in recycling, product substitution, and the growth of bio-based plastics.
  • Formosa's credit rating was downgraded from AA to AA- by the Taiwan Rating Service, partly due to the project's impact on the company's cash flow and rising construction costs.
  • The project's local property tax exemption, worth potentially over $1.5 billion over ten years, was obtained by filing just one day before regulatory reforms that would have required local parish council input.
  • China, the world's largest importer of petrochemicals, is increasing its own domestic cracker capacity, which will likely reduce the growth rate of imports and tighten the global market for new entrants by 2025-26.

Cite the original document

APA
Sanzillo, T., & Mattei, S. (2021). Formosa’s Louisiana Project: Wrong Products, Wrong Time, Wrong Place, Wrong Finances. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Formosa-Louisiana-Wrong-Products-Wrong-Time-Wrong-Place-Wrong-Finances_March-2021.pdf
Chicago
Sanzillo, Tom, and Suzanne Mattei. Formosa’s Louisiana Project: Wrong Products, Wrong Time, Wrong Place, Wrong Finances. Institute for Energy Economics and Financial Analysis, 2021. https://ieefa.org/sites/default/files/resources/Formosa-Louisiana-Wrong-Products-Wrong-Time-Wrong-Place-Wrong-Finances_March-2021.pdf.
Wikipedia
{{cite report |last1=Sanzillo |first1=Tom |last2=Mattei |first2=Suzanne |title=Formosa’s Louisiana Project: Wrong Products, Wrong Time, Wrong Place, Wrong Finances |publisher=Institute for Energy Economics and Financial Analysis |date=March 2021 |url=https://ieefa.org/sites/default/files/resources/Formosa-Louisiana-Wrong-Products-Wrong-Time-Wrong-Place-Wrong-Finances_March-2021.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001246)}}
BibTeX
@techreport{sanzillo2021formosas, author = {Sanzillo, Tom and Mattei, Suzanne}, title = {{Formosa’s Louisiana Project: Wrong Products, Wrong Time, Wrong Place, Wrong Finances}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2021}, month = mar, url = {https://ieefa.org/sites/default/files/resources/Formosa-Louisiana-Wrong-Products-Wrong-Time-Wrong-Place-Wrong-Finances_March-2021.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001246} }

Full text

Collected · Record updated