Evolution of Grid-Scale Energy Storage System Tenders in India

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that India is transitioning from co-located solar+BESS tenders to flexible standalone ESS tenders, such as those by NTPC and SECI, which are critical for meeting the target of 450GW of renewable energy by 2030.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • To achieve the Indian government's target of 450GW of solar and wind capacity by 2030, the Central Electricity Authority (CEA) predicts a requirement of at least 27GW/108GWh of grid-scale Battery ESS (BESS) and approximately 10GW of Pumped Hydro Storage (PHS) by 2030.
  • The Indian government has introduced several initiatives to support ESS, including waiving Inter-state transmission system (ISTS) charges for projects commissioned before June 2025 (provided 51% of charging energy is from solar/wind) and granting infrastructure status to grid-scale ESS in the FY 2022/23 budget.
  • The government's production-linked incentive (PLI) scheme for advanced chemistry cells (ACC) has an outlay of Rs18,100 crores (~US$2.4 billion) and aims to establish a cumulative manufacturing capacity of 50GWh in India by 2025.
  • Recent standalone ESS tenders by NTPC (500MW/3,000MWh) and SECI (500MW/1,000MWh) represent a shift toward 'ESS-as-a-Service' models, offering more flexibility in technology and location compared to earlier solar+BESS EPC tenders.
  • The NTPC standalone tender is particularly flexible, allowing developers to choose any viable storage technology and any location Pan India, provided there is a connection to the ISTS network at a minimum of 220kV.
  • The SECI standalone tender includes a provision allowing developers to use 40% of the project capacity at their own discretion for applications such as energy trading or third-party sales, creating additional revenue streams.
  • A significant regulatory hurdle is that the Indian Electricity Act 2003 does not recognize energy storage as a standalone asset, leading to ambiguity regarding taxation and GST rates for standalone ESS.
  • Technical challenges exist for the NTPC tender's 6-hour storage requirement: BESS is generally not financially viable beyond 4 hours, while PHS typically has a lead time longer than the tender's 24-month commissioning window.
  • NITI Aayog estimates that domestic battery demand in India will grow from 11-15GWh in 2022 to between 100-260GWh by 2030.
  • The Minety BESS project in the UK serves as a case study for Indian stakeholders, demonstrating how participating in multiple markets (Dynamic Containment, capacity market, and arbitrage) ensures revenue certainty.

Cite the original document

APA
Gulia, J., Garg, V., Sharma, P., & Thayillam, A. (2022). Evolution of Grid-Scale Energy Storage System Tenders in India. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2022-06/Evolution-of-grid-scale-ESS-tenders-in-India-JMK-Research_July2022.pdf
Chicago
Gulia, Jyoti, Vibhuti Garg, Prabhakar Sharma, and Akhil Thayillam. Evolution of Grid-Scale Energy Storage System Tenders in India. Institute for Energy Economics and Financial Analysis, 2022. https://ieefa.org/sites/default/files/2022-06/Evolution-of-grid-scale-ESS-tenders-in-India-JMK-Research_July2022.pdf.
Wikipedia
{{cite report |last1=Gulia |first1=Jyoti |last2=Garg |first2=Vibhuti |last3=Sharma |first3=Prabhakar |last4=Thayillam |first4=Akhil |title=Evolution of Grid-Scale Energy Storage System Tenders in India |publisher=Institute for Energy Economics and Financial Analysis |date=July 2022 |url=https://ieefa.org/sites/default/files/2022-06/Evolution-of-grid-scale-ESS-tenders-in-India-JMK-Research_July2022.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001175)}}
BibTeX
@techreport{gulia2022evolution, author = {Gulia, Jyoti and Garg, Vibhuti and Sharma, Prabhakar and Thayillam, Akhil}, title = {{Evolution of Grid-Scale Energy Storage System Tenders in India}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2022}, month = jul, url = {https://ieefa.org/sites/default/files/2022-06/Evolution-of-grid-scale-ESS-tenders-in-India-JMK-Research_July2022.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001175} }

Full text

Collected · Record updated