Evolution of Grid-Scale Energy Storage System Tenders in India
Summary
The report finds that India is transitioning from co-located solar+BESS tenders to flexible standalone ESS tenders, such as those by NTPC and SECI, which are critical for meeting the target of 450GW of renewable energy by 2030.
Key insights
- To achieve the Indian government's target of 450GW of solar and wind capacity by 2030, the Central Electricity Authority (CEA) predicts a requirement of at least 27GW/108GWh of grid-scale Battery ESS (BESS) and approximately 10GW of Pumped Hydro Storage (PHS) by 2030.
- The Indian government has introduced several initiatives to support ESS, including waiving Inter-state transmission system (ISTS) charges for projects commissioned before June 2025 (provided 51% of charging energy is from solar/wind) and granting infrastructure status to grid-scale ESS in the FY 2022/23 budget.
- The government's production-linked incentive (PLI) scheme for advanced chemistry cells (ACC) has an outlay of Rs18,100 crores (~US$2.4 billion) and aims to establish a cumulative manufacturing capacity of 50GWh in India by 2025.
- Recent standalone ESS tenders by NTPC (500MW/3,000MWh) and SECI (500MW/1,000MWh) represent a shift toward 'ESS-as-a-Service' models, offering more flexibility in technology and location compared to earlier solar+BESS EPC tenders.
- The NTPC standalone tender is particularly flexible, allowing developers to choose any viable storage technology and any location Pan India, provided there is a connection to the ISTS network at a minimum of 220kV.
- The SECI standalone tender includes a provision allowing developers to use 40% of the project capacity at their own discretion for applications such as energy trading or third-party sales, creating additional revenue streams.
- A significant regulatory hurdle is that the Indian Electricity Act 2003 does not recognize energy storage as a standalone asset, leading to ambiguity regarding taxation and GST rates for standalone ESS.
- Technical challenges exist for the NTPC tender's 6-hour storage requirement: BESS is generally not financially viable beyond 4 hours, while PHS typically has a lead time longer than the tender's 24-month commissioning window.
- NITI Aayog estimates that domestic battery demand in India will grow from 11-15GWh in 2022 to between 100-260GWh by 2030.
- The Minety BESS project in the UK serves as a case study for Indian stakeholders, demonstrating how participating in multiple markets (Dynamic Containment, capacity market, and arbitrage) ensures revenue certainty.
Cite the original document
- APA
- Gulia, J., Garg, V., Sharma, P., & Thayillam, A. (2022). Evolution of Grid-Scale Energy Storage System Tenders in India. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2022-06/Evolution-of-grid-scale-ESS-tenders-in-India-JMK-Research_July2022.pdf
- Chicago
- Gulia, Jyoti, Vibhuti Garg, Prabhakar Sharma, and Akhil Thayillam. Evolution of Grid-Scale Energy Storage System Tenders in India. Institute for Energy Economics and Financial Analysis, 2022. https://ieefa.org/sites/default/files/2022-06/Evolution-of-grid-scale-ESS-tenders-in-India-JMK-Research_July2022.pdf.
- Wikipedia
- {{cite report |last1=Gulia |first1=Jyoti |last2=Garg |first2=Vibhuti |last3=Sharma |first3=Prabhakar |last4=Thayillam |first4=Akhil |title=Evolution of Grid-Scale Energy Storage System Tenders in India |publisher=Institute for Energy Economics and Financial Analysis |date=July 2022 |url=https://ieefa.org/sites/default/files/2022-06/Evolution-of-grid-scale-ESS-tenders-in-India-JMK-Research_July2022.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001175)}}
- BibTeX
- @techreport{gulia2022evolution, author = {Gulia, Jyoti and Garg, Vibhuti and Sharma, Prabhakar and Thayillam, Akhil}, title = {{Evolution of Grid-Scale Energy Storage System Tenders in India}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2022}, month = jul, url = {https://ieefa.org/sites/default/files/2022-06/Evolution-of-grid-scale-ESS-tenders-in-India-JMK-Research_July2022.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001175} }
Full text
Collected · Record updated