Improving the EV charging experience in India: Beyond charger deployment
Summary
The document argues that while India has significantly increased its public charging infrastructure—growing from 5,151 stations in 2022 to 52,718 by July 2026—the focus must shift from mere deployment to improving the user experience. It identifies critical pain points including poor charger reliability, lack of interoperability between networks, high GST on public charging, and difficulties in installing home chargers in multi-household buildings. To address these, the authors recommend linking government subsidies to verified uptime, mandating a unified payment system, introducing a "right to charge" for residents, and reducing the GST on public charging and battery swapping from 18% to 5%. Additionally, it suggests treating upstream grid upgradation as separate infrastructure costs to be financed at concessional rates and implementing time-of-use (ToU) tariffs to align demand with renewable energy availability.
Key insights
- India has seen rapid growth in EV sales, increasing from approximately 50,000 vehicles in 2016 to around 2.5 million in financial year 2025-2026, with July 2026 monthly sales reaching 307,752 units.
- Public charging infrastructure expanded significantly between 2022 and July 2026, growing from 5,151 to 52,718 stations, yet reliability remains a major issue; a 2024 IEEFA study found nearly 84% of sampled chargers in Delhi were non-functional.
- Interoperability is hindered by the requirement for users to manage multiple apps and wallets across different charging networks, necessitating a potential government mandate for a unified payment system.
- Home charging in high-rise buildings is often blocked by resident welfare associations (RWAs), leading to a recommendation for a "right to charge" for residents with designated parking.
- High taxes increase the cost of public charging and battery swapping; reducing the GST from 18% to 5% would align these services with the tax rate applied to EV purchases.
- Upstream grid upgradation can represent 50% of the total cost of a public charging station, and current funding via the PM E-DRIVE scheme (INR 2,000 crore) is insufficient, covering less than 2% of the 1.32 million chargers needed for 30% EV adoption by 2030.
Cite the original document
- APA
- Konda, C., & Garg, D. (2026). Improving the EV charging experience in India: Beyond charger deployment. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2026-09/EV%20charging%20experience%20in%20India.pdf
- Chicago
- Konda, Charith, and Dhruv Garg. Improving the EV charging experience in India: Beyond charger deployment. Institute for Energy Economics and Financial Analysis, 2026. https://ieefa.org/sites/default/files/2026-09/EV%20charging%20experience%20in%20India.pdf.
- Wikipedia
- {{cite report |last1=Konda |first1=Charith |last2=Garg |first2=Dhruv |title=Improving the EV charging experience in India: Beyond charger deployment |publisher=Institute for Energy Economics and Financial Analysis |date=September 2026 |url=https://ieefa.org/sites/default/files/2026-09/EV%20charging%20experience%20in%20India.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001174)}}
- BibTeX
- @techreport{konda2026improving, author = {Konda, Charith and Garg, Dhruv}, title = {{Improving the EV charging experience in India: Beyond charger deployment}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2026}, month = sep, url = {https://ieefa.org/sites/default/files/2026-09/EV%20charging%20experience%20in%20India.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001174} }
Full text
Collected · Record updated