The review finds that while India's renewable energy sector experienced significant cost of capital compression between 2012 and 2020, costs expanded again by 320 basis points through 2024 due to global monetary tightening, with power purchase agreement counterparty risk remaining the primary financing barrier.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • India's renewable energy sector underwent a complete financing cycle from 2012 to 2024, characterized by a WACC compression of 300-400 basis points between 2012 and 2020 due to market maturation, followed by a 320 basis points expansion through 2024 as global monetary conditions tightened.
  • The historical financing premium that wind projects previously held over solar projects has completely disappeared, with both technologies now accessing debt capital within the same range of 8.5-9.75%.
  • Power purchase agreement (PPA) counterparty risk, specifically the financial distress of electricity distribution companies (DISCOMs), is consistently identified as the most significant financing barrier and the largest contributor to debt risk premiums.
  • India's renewable energy projects face significantly higher financing costs than those in developed markets—with a 670 basis point WACC gap compared to Germany in 2017—but remain competitive in energy pricing due to superior solar resource quality and lower capital expenditures.
  • Policy evolution occurred in four phases: market creation via price guarantees (2010-2015), price discovery through competitive auctions and institutional de-risking (2015-2019), grid integration and supply chain security (2019-2023), and attempts to address systemic off-taker risks (2021-2025).
  • Despite technical achievements in reducing tariffs by over 80%, systemic issues persist, with over 50 GW of successfully auctioned capacity currently stalled because distribution companies are delaying the signing of power purchase agreements.
  • Currency risk has become less material for the sector as India has transitioned toward a domestic financing ecosystem, although it remains a concern for international capital providers.
  • New project types, such as Firm and Dispatchable Renewable Energy (FDRE), introduce complex risk categories including battery replacement uncertainties, market price exposure, and demand fulfillment penalties that traditional frameworks do not address.

Cite the original document

APA
Trivedi, S., & Shrimali, G. (2025). Cost of Capital for Indian Renewable Energy Projects: A Review of Methodologies, Risk Drivers, and Policy Evolution. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2025-12/DP_Review%20Paper_RE%20Cost%20of%20Capital.pdf
Chicago
Trivedi, Saurabh, and Gireesh Shrimali. Cost of Capital for Indian Renewable Energy Projects: A Review of Methodologies, Risk Drivers, and Policy Evolution. Institute for Energy Economics and Financial Analysis, 2025. https://ieefa.org/sites/default/files/2025-12/DP_Review%20Paper_RE%20Cost%20of%20Capital.pdf.
Wikipedia
{{cite report |last1=Trivedi |first1=Saurabh |last2=Shrimali |first2=Gireesh |title=Cost of Capital for Indian Renewable Energy Projects: A Review of Methodologies, Risk Drivers, and Policy Evolution |publisher=Institute for Energy Economics and Financial Analysis |date=December 2025 |url=https://ieefa.org/sites/default/files/2025-12/DP_Review%20Paper_RE%20Cost%20of%20Capital.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001138)}}
BibTeX
@techreport{trivedi2025cost, author = {Trivedi, Saurabh and Shrimali, Gireesh}, title = {{Cost of Capital for Indian Renewable Energy Projects: A Review of Methodologies, Risk Drivers, and Policy Evolution}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2025}, month = dec, url = {https://ieefa.org/sites/default/files/2025-12/DP_Review%20Paper_RE%20Cost%20of%20Capital.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001138} }

Full text

Collected · Record updated