Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that planned infrastructure upgrades to the East Coast Grid could delay forecast gas shortages in southern Australia until 2033, provided there is sufficient gas supply from Queensland.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • Planned infrastructure upgrades to pipelines carrying Queensland gas could cover annual shortages in southern Australian states until 2033, providing a window for governments to implement gas demand reduction measures.
  • The Australian Energy Market Operator (AEMO) forecasts a seasonal gas shortage in eastern Australia in winter 2028 and a structural shortage from 2029, driven by declining production from offshore Victoria.
  • Planned storage developments in Victoria, specifically upgrades to the Iona facility and the development of the Golden Beach site, are likely sufficient to address risks of short-lived peak demand shortages during winter.
  • The proposed Port Kembla Energy Terminal (PKET) in New South Wales, with a capacity of 500TJ/d, could address gas shortages from 2033 onwards and potentially reduce the need for further VNI expansion.
  • Liquefied natural gas (LNG) exporters control over 91% of commercial gas reserves in eastern Australia, meaning domestic supply security relies heavily on the diversion of gas intended for export.
  • Electrification and energy efficiency upgrades, such as industrial heat pumps, could significantly reduce gas demand; industrial heat pumps alone could replace approximately 17% of Australia's total gas use.

Cite the original document

APA
Morrison, K. (n.d.). Delaying eastern Australia’s gas crunch. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2025-06/Delaying%20eastern%20Australia%E2%80%99s%20gas%20crunch_June%202025.pdf
Chicago
Morrison, Kevin. Delaying eastern Australia’s gas crunch. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2025-06/Delaying%20eastern%20Australia%E2%80%99s%20gas%20crunch_June%202025.pdf.
Wikipedia
{{cite report |last1=Morrison |first1=Kevin |title=Delaying eastern Australia’s gas crunch |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2025-06/Delaying%20eastern%20Australia%E2%80%99s%20gas%20crunch_June%202025.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001121)}}
BibTeX
@techreport{morrisonnddelaying, author = {Morrison, Kevin}, title = {{Delaying eastern Australia’s gas crunch}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2025-06/Delaying%20eastern%20Australia%E2%80%99s%20gas%20crunch_June%202025.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001121} }

Full text

Collected · Record updated