The report argues that PGE's strategy of investing in coal upgrades to meet EU BREF standards is financially misguided, as a transition to renewables would be €3 billion cheaper in present value terms after accounting for carbon costs and capacity payments.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • PGE is heavily dependent on fossil fuels, with hard coal and lignite accounting for 91% of its total electricity generation in 2017, while renewables contributed only 4%.
  • The European Union's 2021 BREF air pollution standards pose a significant risk to PGE; data from 2016 and 2017 show that only four out of 15 of the utility's smokestacks met the 2021 standards for nitrogen oxides, sulphur oxides, and dust.
  • PGE's investment in renewables has declined sharply, with capital expenditures in the sector falling 44% in 2017 to represent just 1% of the group's total capex.
  • Compliance with BREF standards increases the levelised cost of electricity (LCOE) for PGE's plants, raising generation costs by approximately 15% to €40/MWh for a sample lignite plant and 10% to €50/MWh for a coal-fired combined heat and power (CHP) plant.
  • New renewable energy sources in Poland are broadly competitive with coal and lignite, with LCOE estimates of €39/MWh for onshore wind, €62/MWh for offshore wind, and €82/MWh for solar power.
  • PGE faces significant carbon price risk as its free allocation of EU allowances (EUAs) is shrinking, falling from 30 million tonnes in 2014 to a projected 0.4 million tonnes in 2020.
  • PGE's financial stability is increasingly reliant on Poland's new capacity market to fund BREF upgrades, but this is a high-risk strategy as EU regulations may eventually ban capacity payments for generation emitting more than 550g of CO2 per kWh.
  • A 'Hurry vs Wait' present value analysis shows that a 'fossil heavy' strategy (Wait) is €3 billion more costly than an overnight shift to 100% renewables (Hurry), because the €12.2 billion in carbon costs outweighs the €5.2 billion in projected capacity payments.
  • PGE's net debt has risen steadily due to coal and lignite investments, increasing to PLN 7.6 billion (€1.9 billion) at the end of 2017 from PLN -1.0 billion in 2014.

Cite the original document

APA
Wynn, G., & Coghe, P. (2018). Decision Time at Poland’s PGE. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Decision-Time-at-Polands-PGE_June-2018.pdf
Chicago
Wynn, Gerard, and Paolo Coghe. Decision Time at Poland’s PGE. Institute for Energy Economics and Financial Analysis, 2018. https://ieefa.org/sites/default/files/resources/Decision-Time-at-Polands-PGE_June-2018.pdf.
Wikipedia
{{cite report |last1=Wynn |first1=Gerard |last2=Coghe |first2=Paolo |title=Decision Time at Poland’s PGE |publisher=Institute for Energy Economics and Financial Analysis |date=June 2018 |url=https://ieefa.org/sites/default/files/resources/Decision-Time-at-Polands-PGE_June-2018.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001116)}}
BibTeX
@techreport{wynn2018decision, author = {Wynn, Gerard and Coghe, Paolo}, title = {{Decision Time at Poland’s PGE}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2018}, month = jun, url = {https://ieefa.org/sites/default/files/resources/Decision-Time-at-Polands-PGE_June-2018.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001116} }

Full text

Collected · Record updated