This report finds that coal lock-in in Southeast Asia is intensifying due to a combined pipeline of nearly 45GW of planned coal capacity and a high prevalence of young, inefficient sub-critical plants backed by long-term contracts.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • A significant portion of the coal-fired capacity in Indonesia, Vietnam, and the Philippines is less than ten years old: 66% (20.7GW) in Indonesia, 83% (17.5GW) in Vietnam, and 58% (6.4GW) in the Philippines.
  • The region relies heavily on inefficient sub-critical technology, which produces up to 75% more carbon pollution and is 67% more water intensive than the latest ultra-super-critical plants. Sub-critical technology is used in 79% of Indonesia's, 76% of Vietnam's, and 75% of the Philippines' installed coal capacity.
  • Coal lock-in is reinforced by long-term power purchase agreements (PPAs) that guarantee payments for 25-30 years, insulating plants from market pressures to decommission under-performing facilities.
  • Despite decarbonization commitments, there is a combined coal pipeline of almost 45GW planned through 2030 for the three countries, with Vietnam having the largest planned additions at nearly 29GW.
  • Financing for the planned coal pipeline is precarious; only 25GW of the 45GW planned capacity has secured financing, and major funders from China, Japan, and South Korea have announced exits from international coal financing.
  • The Asian Development Bank's Energy Transition Mechanism (ETM) faces challenges because state-owned utilities in Indonesia and Vietnam have vested interests in coal, and the mechanism may inadvertently prolong the life of polluting assets if not designed properly.

Cite the original document

APA
Isaad, H. (2021). Coal Lock-In in Southeast Asia. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Coal-Lock-In-in-Southeast-Asia_December-2021_5.pdf
Chicago
Isaad, Haneea. Coal Lock-In in Southeast Asia. Institute for Energy Economics and Financial Analysis, 2021. https://ieefa.org/sites/default/files/resources/Coal-Lock-In-in-Southeast-Asia_December-2021_5.pdf.
Wikipedia
{{cite report |last1=Isaad |first1=Haneea |title=Coal Lock-In in Southeast Asia |publisher=Institute for Energy Economics and Financial Analysis |date=December 2021 |url=https://ieefa.org/sites/default/files/resources/Coal-Lock-In-in-Southeast-Asia_December-2021_5.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001099)}}
BibTeX
@techreport{isaad2021coal, author = {Isaad, Haneea}, title = {{Coal Lock-In in Southeast Asia}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2021}, month = dec, url = {https://ieefa.org/sites/default/files/resources/Coal-Lock-In-in-Southeast-Asia_December-2021_5.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001099} }

Full text

Collected · Record updated