The report finds that the Philippines faces an inevitable risk of stranded coal assets, evidenced by an existing oversupply in Mindanao that cost approximately US$60 million between 2014 and 2016.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • The Philippines has a significant pipeline of coal expansion totaling 10,423 MW (approximately US$20.8 billion), which the report argues creates a material and inevitable risk of stranded assets.
  • Stranding is already occurring in Mindanao due to an oversupply of approximately 700 MW of coal and hydro, resulting in underutilization costs estimated at Php 3 billion (US$60 million) from 2014 to 2016.
  • The current automatic fuel pass-through model in Philippine power purchase agreements (PPAs) protects generators but leaves ratepayers exposed to international coal price volatility and currency exchange risks.
  • The Atimonan Power Project, a proposed 1,200 MW ultra-supercritical plant, is cited as an example of the risks of imported coal, including potential site vulnerability to storm surges and flooding due to its low elevation (approximately 3 meters above sea level).
  • Meralco has introduced 'carve-out' provisions in its PSAs to protect ratepayers by allowing the utility to reduce contracted capacity if demand falls due to retail competition or renewable energy encroachment, shifting the risk to power providers.
  • Renewable energy cost deflation and the potential for a coal tax (updating the current insignificant excise tax of Php 10 per ton) are identified as key drivers that will accelerate the stranding of coal assets.
  • Financial institutions in the Philippines are accused of 'moral hazard' by not incorporating stranded-asset risks into their project finance underwriting for coal projects.
  • IEEFA's financial modeling suggests the levelized cost of electricity for the Atimonan plant would be 5% higher than claimed in the PSA, primarily due to underestimating coal prices.

Cite the original document

APA
Ahmed, S. J., & Jr., J. L. (2017). Carving out Coal in the Philippines. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/resources/Carving-out-Coal-in-the-Philippines_IEEFAICSC_ONLINE_12Oct2017.pdf
Chicago
Ahmed, Sara Jane, and Jose Logarta Jr. Carving out Coal in the Philippines. Institute for Energy Economics and Financial Analysis, 2017. https://ieefa.org/sites/default/files/resources/Carving-out-Coal-in-the-Philippines_IEEFAICSC_ONLINE_12Oct2017.pdf.
Wikipedia
{{cite report |last1=Ahmed |first1=Sara Jane |last2=Jr. |first2=Jose Logarta |title=Carving out Coal in the Philippines |publisher=Institute for Energy Economics and Financial Analysis |date=October 2017 |url=https://ieefa.org/sites/default/files/resources/Carving-out-Coal-in-the-Philippines_IEEFAICSC_ONLINE_12Oct2017.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-001073)}}
BibTeX
@techreport{ahmed2017carving, author = {Ahmed, Sara Jane and Jr., Jose Logarta}, title = {{Carving out Coal in the Philippines}}, institution = {Institute for Energy Economics and Financial Analysis}, year = {2017}, month = oct, url = {https://ieefa.org/sites/default/files/resources/Carving-out-Coal-in-the-Philippines_IEEFAICSC_ONLINE_12Oct2017.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-001073} }

Full text

Collected · Record updated