Assessing the effectiveness of India’s solar production-linked incentive scheme

Report an error

Summary

AI-generated

This summary is written by a language model reading the source document. It is not the publisher's words and is not a substitute for the original.

Learn more about AI enrichment

The report finds that while India's solar PLI scheme has revived investor confidence and increased domestic module and cell capacity, it has significantly underperformed against its targets as of June 2025. Only 56% of module and 14% of polysilicon capacity targets were achieved, with upstream integration hindered by high capital intensity, policy inconsistencies regarding the Approved List of Models and Manufacturers (ALMM), and a heavy reliance on Chinese technical expertise and machinery. The report highlights substantial financial risks for awardees and suggests that future iterations should shift toward a comprehensive manufacturing-linked framework including upfront capital subsidies and longer policy tenures to achieve true self-reliance.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • As of June 2025, the solar PLI scheme has failed to meet its primary capacity and investment targets, achieving only 31GW of the targeted 65GW of module manufacturing capacity and attracting Rs48,120 crore of the intended Rs94,000 crore in investment.
  • Upstream manufacturing remains the weakest link in India's solar value chain; while the PLI scheme drove all existing polysilicon capacity (3.3GW) and 75% of wafer capacity (5.3GW), these segments are largely non-operational or severely delayed due to extreme capital intensity.
  • Policy inconsistencies, specifically the deferment and reinstatement of the Approved List of Models and Manufacturers (ALMM), created investor uncertainty and allowed cheap imports to erode the financial viability of domestic integrated facilities.
  • Technical implementation was severely hampered by a 99% reduction in visas for Chinese nationals between 2019 and 2024, which delayed the installation and commissioning of critical machinery imported from China.
  • The PLI incentive structure is considered inadequate compared to international benchmarks, providing only 5-10% of production costs, whereas the US Inflation Reduction Act (IRA) offers support three to five times higher.
  • Solar PLI awardees face cumulative financial risks of up to Rs41,834 crore due to potential bank guarantee encashments, lost incentives, and unrealised revenue, although a 2025 two-year commissioning extension provides temporary relief.
  • New trade barriers, specifically a combined 50% tariff imposed by the US on Indian solar exports in July and August 2025, threaten to create a domestic oversupply of panels in 2026.

Cite the original document

APA
Institute for Energy Economics and Financial Analysis (n.d.). Assessing the effectiveness of India’s solar production-linked incentive scheme. https://ieefa.org/sites/default/files/2025-12/Assessing%20the%20effectiveness%20of%20India%E2%80%99s%20solar%20production-linked%20incentive%20scheme%20formatted.pdf
Chicago
Institute for Energy Economics and Financial Analysis. Assessing the effectiveness of India’s solar production-linked incentive scheme. n.d. https://ieefa.org/sites/default/files/2025-12/Assessing%20the%20effectiveness%20of%20India%E2%80%99s%20solar%20production-linked%20incentive%20scheme%20formatted.pdf.
Wikipedia
{{cite report |author=Institute for Energy Economics and Financial Analysis |title=Assessing the effectiveness of India’s solar production-linked incentive scheme |url=https://ieefa.org/sites/default/files/2025-12/Assessing%20the%20effectiveness%20of%20India%E2%80%99s%20solar%20production-linked%20incentive%20scheme%20formatted.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000949)}}
BibTeX
@techreport{instituteforenergyeconomicsandfinancialanalysisndassessing, author = {{Institute for Energy Economics and Financial Analysis}}, title = {{Assessing the effectiveness of India’s solar production-linked incentive scheme}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2025-12/Assessing%20the%20effectiveness%20of%20India%E2%80%99s%20solar%20production-linked%20incentive%20scheme%20formatted.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000949} }

Full text

Collected · Record updated