The report finds that India's ACC PLI scheme has significantly underperformed, with only 2.8% of its 50GWh target commissioned by October 2025. Major bottlenecks include aggressive timelines, stringent domestic value addition (DVA) requirements, and a heavy reliance on China for equipment and critical minerals. While some capacity is being developed outside the scheme, the report suggests that India remains five to ten years away from a competitive cell manufacturing industry without strategic interventions in mineral sourcing, refining, and tariff protections.

Key insights

AI-generated

These insights are written by a language model reading the source document. They are not the publisher's words and are not a substitute for the original.

Learn more about AI enrichment
  • As of October 2025, the ACC PLI scheme has failed to meet its primary capacity targets, with only 1.4GWh (2.8%) of the 50GWh goal commissioned, all of which was achieved by Ola Electric.
  • The scheme has seen negligible success in job creation and incentive disbursement; only 1,118 jobs (0.12% of the estimated 1.03 million) have been generated, and zero incentives have been paid out because no beneficiary has met the required milestones for commercial sales.
  • Beneficiaries have struggled with design flaws in the scheme, specifically the aggressive two-year installation timeline and stringent domestic value addition (DVA) requirements (25% within two years and 60% within five years), which are difficult for first-time manufacturers.
  • India's battery sector faces severe structural risks due to an almost total dependence on China for manufacturing equipment, refined critical minerals, and the global recycling market, where China controls over 70% of the market.
  • Implementation has been further delayed by a lack of skilled domestic technicians and bottlenecks in visa approvals for Chinese technical specialists required for equipment installation.
  • Despite the failures of the PLI scheme, there is significant activity outside the program, with approximately 178GWh of capacity under development by non-PLI players, driven by the 'China+1' strategy.
  • The report recommends that the government extend implementation timelines by one year, waive penalties, and introduce a dedicated scheme for critical mineral sourcing and refining, alongside tariff protections like basic customs duty (BCD).

Cite the original document

APA
Garg, D. (n.d.). PLI Scheme for Advanced Chemistry Cells. Institute for Energy Economics and Financial Analysis. https://ieefa.org/sites/default/files/2026-02/Assessing%20India%27s%20ACC%20PLI%20scheme_JMK_IEEFA.pdf
Chicago
Garg, Dhruv. PLI Scheme for Advanced Chemistry Cells. Institute for Energy Economics and Financial Analysis, n.d. https://ieefa.org/sites/default/files/2026-02/Assessing%20India%27s%20ACC%20PLI%20scheme_JMK_IEEFA.pdf.
Wikipedia
{{cite report |last1=Garg |first1=Dhruv |title=PLI Scheme for Advanced Chemistry Cells |publisher=Institute for Energy Economics and Financial Analysis |url=https://ieefa.org/sites/default/files/2026-02/Assessing%20India%27s%20ACC%20PLI%20scheme_JMK_IEEFA.pdf |access-date=5 November 2026 |via=Climate Insights Directory (document ieefa-000947)}}
BibTeX
@techreport{gargndpli, author = {Garg, Dhruv}, title = {{PLI Scheme for Advanced Chemistry Cells}}, institution = {Institute for Energy Economics and Financial Analysis}, url = {https://ieefa.org/sites/default/files/2026-02/Assessing%20India%27s%20ACC%20PLI%20scheme_JMK_IEEFA.pdf}, urldate = {2026-11-05}, note = {Indexed by Climate Insights Directory, document ieefa-000947} }

Full text

Collected · Record updated